Laserfiche WebLink
MAP LEGEND, MINING MAP <br />AND RECLAMATION MAP <br />A -Actual permit boundaries,x <br />B -Affected permit boundaries ~ a ~ <br />C -Irrigation ditch location <br />D -Concrete batch plant location, included in permit, <br />E -Asphalt batch plant location, included in permits ~ ~ tr.2,Lc~ ""~ 6't~^'-"'L~¢e~tew~," <br />F -Building location ~~ <br />G -Overburden and stockpile location - <br />H -Any and all access roads included in permit. <br />I -Discharge point of asphalt -batch plant sump and check-dam. Z, <br />1 -Area to be reclaimed, backfilled, compacted and sloped to 2 1/2 to 1 slope and <br />revegetated according to reclamation plan again s <br />2 -Area "A", Phase 1, 1984, approximately 3.0 acres mined and stripped of topsoil <br />and stored, approximately 1, 600 cubic yards. • <br />3 -Area "A", Phase 1, 1985, approximately 2.0 acres mined and stripped of topsoil <br />and stored, approximately 2,400 cubic yards. o <br />4 -Area "C", Phase 3, Eleven acres, area to be mined 1985-1990, stripped of topsoil <br />and stored, approximately 9,000 cubic yards. Mining starts on the east side and <br />ends on the north border. a <br />5 - Area'S", Phase 2, Area of approximately 5 acres to be mined 1990 through 1992, <br />to be stripped of tops oil and stored, approximately 4,000 cubic yards. Mining <br />starts on south side and ends on north border. • <br />6 -Unaffected area o <br />7 -Topsoil and overburden storage area, 7 acres. ~ <br />8 -Drainage ditch, 3 ft. deep. • <br />9 -Main outlet channel for drainage # <br />10-Drainage channel a <br />11-Discharge point for drainage ditch • <br />12-Slopes reclaimed area 2 1/2 to one slope .. <br />13-Reclamation contour lines, 18 ft. lower - 5, 307 ft. <br />14-Berms, 3 ft. , <br />15-Natural Drainage <br />16-Parking Area ~ <br />17-Disposal of waste, asphalt and concrete : <br />18-Broken Irrigation Pipe ~ <br />A-A Drawing - ''Runoff Diversion • <br />B-B Drawing -Runoff Channel • <br />B-B-Drawing -Drainage channel for sump • <br />B-B. Drawing -Main Runoff Channel <br />C-C Drawing -Check Dam ~ <br />SCALE: 1:200' <br />