My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40671
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:49 PM
Creation date
11/23/2007 10:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980224
IBM Index Class Name
General Documents
Doc Date
6/21/1985
Doc Name
TR FREMONT PAVING & REDI MIX INC MCKENZIE PIT MLRD FN M-80-224
From
JLS MINING RECLAMATION CONSULTANTS
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "E" -RECLAMATION PLAN (Technical Revision 6-20-85, Page 9) <br />sedimentation. <br />The water that collects in the mined area will be allowed to drain at a .OS% grade <br />from the back wall towards the north an west a ges of the terrace. Presently, please <br />note that the elevation of Highway 115 is 5, 325 ft. ; the elevation at 2 ( 1 is 5, 258 ft. <br />11~ 1 Z <br />and the Section Corner elevation at the base of the terrace is 5, 258 ft. (See Map in <br />Exhibit "C'~. Therefore, the majority of the water runs to the north and east side at <br />\Q the top of the terra`tc,e~{and runs through five water channels down to the irrigation canal. <br />~/ 1~'~Y - - `Q ,.~csc''~;~+-~ i,.. ~...~d ofi,a,.-.:. r4, sty.-,.~ w ?-U~ ? \ <br />The operator will cut these channels to a depth of three ft. lined with rock and compact <br />~~ the sides to prevent erosion and sedimentation at a slope of 2 1/2:1, as outlined in <br />s~ blue on drawing "B". This will allow the water to drain through the irrigation ditch. i <br />~+ The operator will also plane rip-rap along the head of these channels to prevent <br />`~ ~ j: <br />(~ <br />~°~~p erosion and sedimentation. A ; <br />',,y d' The operator will place a 3 ft. overburden and concrete berm along the top of <br />~'D ~t . <br />the mesa and thus allow the water to run through only one channel as outlined. As <br />the mining proceeds, the operator will use the same drainage plan for the north and <br />west side (See map, Exhibit "C" in red) which will drain into the natural drainage Gay <br />.tM~~ - OFsa. /yYl6~tL G-v~cu- ~.~--- - e,c~7A,.dt ~ O <br />found on the west side as outlined on the map. The operator will have a buffer of <br />undisturbed land on the north west side and will build a berm along the edge of this <br />3 ft. high to stabilize the sides by channeling the runoff to the one drainage channel <br />for runoff (See map, Exhibit "C"), as previously outlined. <br />~~~~ ~ A quick-cover seed mixture of sweet clover (lj2 lb. Jac re) and perennial rye <br />~3 lbs. /acre) will be hand seeded to guard against erosion, with the Reclamation <br />Plan Seed mixture specifications being followed when final reclamation is initiated. <br />This completes the drainage system set-up. <br />
The URL can be used to link to this page
Your browser does not support the video tag.