Laserfiche WebLink
~antbert arib S~~acgotiate~ <br />iii iiiiininiii iii <br />999 <br />CONSULTING OEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M98209MT DATE: Monday, 9-21-98 <br />PROJECT NAME: west Elk Mine Gob Pile <br />PROJECT LOCATION:Somerset, Colorado <br />CLIENT: Chesnik Construction <br />CONTRACTOR: Chesnik Construction <br />TECHNICIAN:casias <br />WEATHER CONDITIONS: sunny <br />WORK REQUESTED:Denisty <br />tests <br />FOREMAN: <br />Mr, Chuck Chesnik <br />WORK PERFORMED B LAMBERT AND ASSOCIA7 5 REPRESENTATIVE AND REMARKS <br />I azrived at the project site at 9:30 A.M. as requested by Mr, Chuck Chesnik. <br />2 performed soil density tests as requested by Mr. Chesnik of material being <br />placed for the gob pile subbase using nuclear soil density test methods. Please <br />refer to the test results sheets for approximate test locations and test results. <br />The test locations were determined by Mr. Chesnik, The test results indicate <br />only the relative compaction and soil moisture content of the material tested <br />at the elevation and location tested at the time of our site visit. <br />C ( ~~ ~~~ <br />a. o. eox »w n. o. sox ooa =u sooo oti <br />auno.+uMerwM. co x~sm woKrnosa, co a~ox ounu~ao, co nx~ <br />p>q x~s~sa ~ pso) tur s~ p7o1 xsrxn <br />