Laserfiche WebLink
<br /> <br />Stipulation No. 10 <br />PEABODY COAL COMPANY MUST REVISE <br />ISSUANCE THE PERMIT APPLICATION <br />CONTAINMENT DITCH RECLAMATION. <br />WITHIN THIRTY (30) DAYS OF PERMIT <br />TO ADDRESS THE FINAL DISPOSITION OF <br />Stipulation No. 11 <br />PRIOR TO SEDIMENT POND 006 CONSTRUCTION PEABODY COAL COMPANY MUST OBTAIN A <br />WATER OR STORAGE RIGHT TO STORE WATER AT THIS POND. THE WATER OR STORAGE <br />RIGHT SHOULD BE INCORPORATED INTO THE PERMIT APPLICATION. <br />Stipulation No. 12 <br />PEABODY COAL COMPANY MUST SUBMIT WITHIN <br />A DETAILED PLAN FOR POND DEWATERING TO A <br />TEN-YEAR, TWENTY-FOUR HOUR STORM WITHOUT <br />SPILLWAY. <br />Stipulation No. 13 <br />SIXTY (60) DAYS OF PERMIT ISSUANCE <br />LEVEL TO ENSURE CONTAINMENT OF A <br />DISCHARGE THROUGH THE EMERGENCY <br />A PERFORMANCE BOND IN THE AMOUNT OF E2,646,300.00 PAYABLE TO THE STATE OF <br />COLORADO AND THE OFFICE OF SURFACE MINING, MUST BE FILED WITH THE DIVISION <br />WITHIN 30 DAYS OF ISSUANCE OF THE PROPOSED DECISION. <br />-5- <br />