My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40636
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:47 PM
Creation date
11/23/2007 10:47:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
8/8/1985
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Stipulation No. 1 <br />WITHIN 30 DAYS OF ISSUANCE OF THE PROPOSED DECISION FOR THE SENECA II-W <br />MINE, THE APPLICANT MUST UPDATE THE POST-MINING LAND USE DESCRIPTION <br />PORTION OF THE PERMIT APPLICATION TO INCLUDE COMMENTS RECEIVED CONCERNING <br />THE PROPOSED USE BY THE LEGAL AND EQUITABLE OWNERS OF RECORD AS WELL AS <br />THE APPROPRIATE STATE AND LOCAL AGENCIES WHICH WOULD HAVE TO INITIATE, <br />IMPLEMENT, APPROVE, OR AUTHORIZE THE PROPOSED USE OF THE LAND FOLLOWING <br />RECLAMATION. <br />Stipulation No. 2 <br />THE FOLLOWING SPRINGS WILL BE MONITORED TRI-ANNUALLY FOR DISCHARGE, pH, <br />TEMPERATURE, AND CONDUCTANCE: S-1, S-5, S-7, S-9, 5-23, 5-25, S-41, AND <br />OLSON SPRING (S-45 ). <br />IN ADDITION TO THE ABOVE FIELD PARAMETERS, THE FOLLOWING SPRINGS WILL BE <br />SAMPLED IN AUGUST FOR WATER QUALITY ANALYSES: S-9, 5-41 ., AND OLSON SPRING <br />(5-45 ). <br />THE WATER QUALITY PARAMETERS TO BE SAMPLED FOR ARE LOCATED IN TABLE 7-77 <br />OF THE PERMIT APPLICATION. <br />Stipulation No. 3 <br />WELLS AT SITE GW-42-S2W-1, 2, 3, 4, 5, 6A, and 7A WILL BE MONITORED <br />MONTHLY FOR WATER LEVEL (TO BE REPORTED IN FEET ABOVE OR BELOW LAND <br />SURFACE DATUM) AND FIELD PARAMETERS (TEMPERATURE, SPECIFIC CONDUCTANCE AND <br />pH ). QUARTERLY WATER QUALITY SAMPLES WILL ALSO BE TAKEN AT EACH WELL FOR <br />THE SAME PARAMETERS AS REPORTED IN THE PERMIT APPLICATION IN TABLE 7-77. <br />Stipulation No. 4 <br />PEABODY COAL COMPANY MUST SUBMIT T0, AND, HAVE APPROVED BY THE DIVISION A <br />PLAN FOR MONITORING SPOILS WATER. THIS PLAN SHOULD INCLUDE INSTALLATION <br />OF SPOILS MONITORING WELLS, A SCHEDULE OF MONITORING WELLS, A SCHEDULE OF <br />MONITORING AND A LISTING OF PARAMETERS TO BE MONITORED. THIS PLAN MUST <br />SUBMITTED WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 5 <br />PEABODY COAL COMPANY WILL SUBMIT AN ANNUAL HYDROLOGIC REPORT TO THE <br />DIVISION FOLLOWING EACH WATER YEAR (OCTOBER 1 TO SEPTEMBER 30). THIS <br />REPORT SHALL INCLUDE ALL OF THE REDUCED AND TABULATED SURFACE AND GROUND <br />WATER DATA COLLECTED DURING THE YEAR. AN INTERPRETATION OF THE DATA AND <br />DISCUSSION OF POSSIBLE TRENDS SHOULD BE INCLUDED IN THE REPORT. THIS <br />REPORT SHALL BE SUBMITTED TO THE DIVISION NO LATER THAN FEBRUARY 28TH OF <br />THE FOLLOWING YEAR. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.