My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40634
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:47 PM
Creation date
11/23/2007 10:46:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978314
IBM Index Class Name
General Documents
Doc Date
11/24/2000
Doc Name
CIRCES COST ESTIMATING SOFTWARE COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Date : 24-Nov-2000 Permit or job no.: M-78-314 Site :Hewes Pit <br />User : ESC Abbreviation : none State :Colorado <br /> Filename : M314-000 County : Routt <br />Agency or organization name :Division Of Minerals 8 Geology <br />Permit or job action :Reevaluate amount of required bond <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Backfill Pit Area dozer 1 5.1 $620 <br />002 -Replace 12" Topsoil on Pit Area dozer 1 46.35 $1,959 <br />003 -Back(ll 'County Pit' dozer 1 1.9 $230 <br />004 -Replace 12"Topsoil on 'County Pit' dozer 1 4.4 $534 <br />005 -Revegefate Affected Area revege 1 20.00 $2, 690 <br />006 i Mobilization/Demobilization mobilize 1 2.8 $775 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 80.69 $6,606 <br />inclutles inflation factor atljustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />not requiretl (or eqp. operator serves as super) <br />1.55 <br />1.05 <br />NA' <br />10.00 <br />TOTAL DIRECT COST= $6,606 <br />of direct total = $106 <br />of direct total = $71 <br />NA NA total = NA <br />of dimct total = $681 <br /> TOTAL O 8 P = $858 <br />CONTRACT AMO UNT (tlired+08 P)= $7,666 <br />PROJECT MANAGEMENT <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 °.6 of cntr. NA total = $383 <br />CONTINGENCY - NA' NA total = NA <br />'ronhngencieS acCOUnfetl for at tasklevel TOTAL INDIRECT COST= $1,241 <br /> TOTAL BOND AMOUNT (direct+ indirect) _ $8,049 <br />
The URL can be used to link to this page
Your browser does not support the video tag.