Laserfiche WebLink
<br />1 <br />u <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />~~ <br /> <br /> <br /> <br /> <br />CENTENNIAL MATERIALS, INC. 94-189 <br />CASTLE ROCK QUARRIES 5/26/95 <br />PRE MINING BASIN DATA CALCULATIONS - TPY <br />TUTTLE APPLEGATE, INC. <br /> <br /> <br />SEGMENT LENGTH ELEVATION ELEVATION ELEVATION SLOPE <br />(FT) (FT) (FT) (FT) (FT/FT) <br />1 TI 300 6,750 6,745 5 0.0167 <br /> T2 2,513 6,745 6.680 65 0.0259 <br /> T3 2;292 6,680 6,480 200 0.0873 <br /> Ttot 5,105 <br /> TI 300 6,690 6,685 5 0.0167 <br /> T2 1,194 6,685 6.560 125 0.1047 <br /> T3 1,140 6,560 6,480 80 0.0702 <br /> Ttot 2,634 <br />3 TI 300 6,755 6,750 5 0.0167 <br /> T2 1,230 6,750 6,700 50 0.0407 <br /> T3 4,921 6,660 6,480 180 0.0366 <br /> Ttot 6,451 <br />4 TI 300 6,730 6,725 5 0.0167 <br /> T2 1,807 6,775 6,700 75 0.0415 <br /> T3 2,621 6,660 6,560 100 0.0382 <br /> Tto[ 4,728 <br />5 TI 300 6,750 6,730 20 0.0667 <br /> T2 1,020 6,730 6,680 50 0.0490 <br /> T3 915 6,680 6,545 135 0.1475 <br /> Ttot 2,235 <br />6 T1 300 6,770 6,735 35 0.1167 <br /> T2 1,428 6,735 6,670 65 0.0455 <br /> T3 700 6.670 6,625 45 0.0643 <br /> Ttot 2,428 <br />7 Tl 300 6,810 6,790 20 0.0667 <br /> T2 1,148 6,790 6,740 50 0.0436 <br /> T3 1,452 6,740 6,640 100 0.0689 <br /> Ttot 2,900 <br />8 TI 300 6,810 6,790 20 0.0667 <br /> T2 1,678 6,790 6,740 50 0.0298 <br /> T3 738 6,740 6,650 90 0.1220 <br /> Ttot 2,716 <br />9 TI 300 6,810 6,790 20 0.0667 <br /> T2 1,572 6,790 6,740 50 0.0318 <br /> T3 855 6,740 6,685 55 0.0643 <br /> Ttot 2,727 <br />C:\PROJECTS\94189\BPATHS.VV81 <br />1 <br /> <br />