My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40552
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40552
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:43 PM
Creation date
11/23/2007 10:44:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984014
IBM Index Class Name
General Documents
Doc Date
9/12/2007
Doc Name
Response
From
Cotter Corporation
To
DRMS
Permit Index Doc Type
JD08
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compared to the groundwater level beneath the mine's waste pile. Assuming a conservative <br />hydraulic gradient of 180 feet/mile, similar to the value used in the SM-18 analysis, this would <br />result in a water level under the mine's waste pile of 109 feet below the water table in the <br />alluvium iu the Paradox Valley. <br />To determine the depth to ground water under the waste pile at JD-6, one may properly <br />use the well elevation of 5704 feet and then subtract the depth to water, which calculation yields <br />a potentiometric surface of 5444 feet. Next, by subtracting the hydraulic gradient necessary for <br />water to flow from the alluvium to the bedrock, we see a resulting potentiometric surface of 5335 <br />feet. <br />Since the JD-6 mine's waste rock pile is located at an average elevation of 5850 feet, the <br />resulting depth to water is 515 feet over 100 feet lower than assumed in the earlier <br />analysis. <br />Referring to the attached geologic cross section, the potentiometric surface would be <br />approximately at the base of the Entrada Sandstone. The Cotter migration pathway computer <br />analysis showed that, after 1,000 years, concentrations at one millionth of the initial waste rock <br />leakage concentration would only reach the upper portion of the Entrada Sandstone. <br />Using the Division's reasonable assumption that hydraulic communication exists between <br />the alluvium and bedrock aquifers, the depth to water at the JD-6 mine can be reasonably <br />estimated to be significantly lower than the previous modeling analysis and, therefore, there is no <br />technical reason for installing a monitoring well. <br />JD-8 Mine <br />The analysis of fracture flow in unsaturated conditions which is attached was <br />submitted to the Division in response to questions raised about the JD-8 mine. This analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.