My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40455
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:38 PM
Creation date
11/23/2007 10:41:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
General Documents
Doc Date
10/31/2002
Doc Name
Summary of Meeting at DMG
From
DMG
To
DGMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303)832-8106 <br />October 31, 2002 <br />N FcF~~~~ <br />°j°~S%~~.: v ~s ~2 <br />Jim Bender <br />Deadwood Gulch Mining Co ~ <br />5529 US Highway 64 <br />Farmington, NM 87401 <br />Re: Incas Mine, Permit M-1986-076, Smmnary of Meeting at DMG Durango Field Office. <br />Dear Mr. Bender, <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Ronald W. Cattany <br />Acting Division Director <br />Thank you for the time you spent in coming to Durango on October 29, 2002, to discuss various topics related to <br />the DMO permit at the Incas Mine. I feel it was especially valuable because Harry Posey, a specialist from our <br />Denver office, was present also. As you know, we had planned to meet you at the mine site that day to discuss <br />these same issues, but the road was in poor shape due to the weather, and attempting to drive up there would have <br />been animprovident exercise. <br />You also hand-delivered an analysis of the water samples taken in June 2000, but which had not been analyzed . <br />until August 2002. The information in the reports is of limited use, but some of the results indicate certain <br />general qualities in the water For monitoring or enforcement purposes, however, they fulfill no requirement. <br />Thank you for having the samples analyzed anyway, and for delivering the results. <br />I have tried to summarize most of the important topics of our meeting in the following pazagraphs. Some of this <br />is information for your use, and some are items which will require a future response or action from you. <br />Tailines Pond. This site is a DMO, which carves with it the requirement that various structures which are to be <br />built or used in the operation must comply with the rules concerning Environmental Protection Plans (EPPs) and <br />Environmental Protection Facilities (EPFs). These are to carry a certification of design and construction, mainly <br />for purposes of environmental protection, but also to ensure that by operating within the limits of the approved <br />plans there is a sufficient bond posted. Your present operation is utilizing a tailings disposal pond for which there <br />is no documented design of its size and configuration, stability of its location, materials used in its construction or <br />underlying it, or certifying its construction to a specification. The concerns related to this are that the structure <br />may move or become damaged in its present hillside location due to the underlying strata, contribution of <br />groundwater (daylighting from the shallow bedrock) or stormwater runoff, or sediment loading. The approved <br />DMO plans allow this type of tailings disposal in the permitted area, but not in this exact location. Since the <br />thickness of the talus (in other words, the depth to bedrock) is variable, then uniform stability cannot be assured <br />throughout the slope. Also, different areas of the slope receive different amounts of stormwater runoff, by virtue <br />of the roads and drainage controls on the site, which affects the capacity of the pond. It is possible that drainage <br />control work will need to be done to divert stormwater runoff to other areas in an effort to provide better stability <br />and assurance of maximum freeboard of the tailings impoundment. Without having provided any information as <br />to the pond itself, and documentation of possible onsite influences, the requirements for the EPF rules are not <br />being met. Your written response to this item will be to provide the needed information, including design <br />specifications, fetch area of the runoff slope, upslope drainage controls, and characteristics of the site where it is <br />located. If some of this exists already in the file for other locations on the permit, and which are also applicable to <br />this location, you may make that reference. For all new documentation, this office will work with you if <br />necessary, but it must be provided. Please review Hard Rock and Metals Rules 7.3 and 7.4. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.