Laserfiche WebLink
.:Unb!~iEL ~~ulUl:~i1C .. ..;;1 <br />T::!cph nnc J03 9°7 ~J15 <br />October 25, 1989 <br />- / ~.ro'~ - . i ~ I, . L III I I I I I I I II IIII III <br />i <br />v~1 I q ~ q !til Icy- ~ t~v`vi <br /> <br />OCT ? 7 1989 <br />MINED LwtvU <br />RECI_AM.4TICN vIV16E^sU <br />per. Matthew S. Haves <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-22;3 <br />Re: Response to Mid-term Review <br />Dear Matt: <br />Attached are revised pages 4-69, 4-70c, and 4-72b in response to questions <br />Nos. 1 and 2, Hydrologic 9alanoe section, of the Division's mid-term review; as <br />committed to in West Eik Coal Company, Inc.'s (WECC) initial raid-ierm <br />response letter dated August 15, 1989. In response to question No. 3, a list <br />of the completion reports which should be contained in Exhibit 2.8.2.A.1 has <br />been prepared. Attached are copies of the 1988 completion reports to update <br />your copies of this Exhibit. All other reports listed should already be included <br />in the Exhibit. WECC's response to the Division's species diversity standard <br />concern was submitted September 29, 1989. <br />The following is a review of the stipulations listed in Appendix II of the mid- <br />term review which were indicated to be "Active" or "Future" status. WECC's <br />response to the stipulations and/or the location in the permit text where the <br />stipulations have been incorporated are included. <br />Stipulation 1. - This stipulation has been complied with. An <br />adjudicated plan was submitted with technical revision No. 55 (B <br />~ Seam) in Exhibit 4.9.A.1 , "West Elk Coal Company, Mt. Gunnison No. <br />1 Mine, Water Augmentation Plan" and as described in Section <br />4.9.A.8, page 4-72H. <br />Stipulation 2. -The submittal of an Annual Hydrology Report (AHR) <br />is committed to in Section 3.2.8.1, page 3-29, and Section 4.9.1, page <br />4-08, Section 4.92, page 4-70, and Section 4.9.3, page 4-71 have <br />been revised to include the information required by this stipulation in <br />the AHR. <br />Stipulation 3. - WECC's plan for the construction of water tight seals <br />in the case of toxic discharge is contained in Section 3.5.2, pages 3- <br />81 to 3-87 of the existing permit. <br />