Laserfiche WebLink
<br />~II II~~IIII~~~~~ ~I~ <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />t 313 Sherman St.. Room 215 <br />Denver. CO 80203 <br />303 8663567 <br />Fa%:303 832-8706 <br />pF COO <br />~.r ~'~q <br />.~" (~ ~O <br />. j`e±•i/ <br />Roy Homer. <br />Governor <br />Fred R. Banta. <br />Drvisian Director <br />February 22, 1990 <br />Mr. Brian D. Gorttarek <br />Pittsburg 8 Midway Coal <br />6400 S. Fiddlers Green <br />Englewood, CO 80111 <br />Mining Company <br />Circle <br />RE: Edna Mine Midterm Review, Permit C-80-001 <br />Dear Mr. Gontarek: <br />Pursuant to Rule 2.08.3(1), "The Division shall review each permit issued and <br />outstanding under these rules not later than the middle of the permit term <br />. ." After this review, the Division may require revisions or modifications <br />to the permit to ensure continued permit compliance. Additionaily, pursuant <br />to Rule 3.02.2(4), "The Division shall review the amount of bond required for <br />a permit area and the terms of acceptance of the bond at the time permit <br />reviews are conducted under 2.08.3 ..." <br />The Edna Mine permit was originally issued on November 16, 1981 for a <br />five-year term with the permit scheduled to expire on November 16, 1986. The <br />permit renewal process was completed and the renewal approved on <br />January 7, 1988. The permit issued at that time was inadvertently back dated <br />to expire on January 7, 1993. This was incorrect. The permit should have <br />been back dated to reflect an expiration date of November 16, 1991. It is <br />Division policy to assure that expiration dates remain the same as on the <br />originally issued Colorado State permit. Therefore, two original copies of <br />replacement pages 1, 4, and 6 for the permit document have been included with <br />this midterm review. These permit replacement pages indicate the correct <br />expiration date of November 16, 1991. Please have an officer of Pittsburgh 3 <br />Midway sign page 6 of both copies of these pages and return one copy for <br />Division files. The midterm due date for the present permit was November 16, <br />1989. <br />This midterm review consisted of reviewing the permit application document, <br />findings document, stipulation responses, revisions to the permit, monitoring <br />reports, and inspection reports. The enclosed document is the Division's <br />midterm review of this mine. This review contains five sections: <br />Section I - History <br />Section II - Revisions to the Permit <br />Section III - Status of Stipulations <br />Section IY - Permit Variances <br />Section V - Decision to Require Revisions <br />STATE OF COLORADO <br />