My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40226
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:28 PM
Creation date
11/23/2007 10:34:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Date
12/13/1983
Doc Name
MEMO REVIEW OF TRINIDAD BASIN MINING CO RESPONSES TO STIPULATIONS 14 & 15 PN C-048-81
From
MLRD
To
MIKE SAVAGE
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiu iii <br />999 <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches. Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richard D. Lamm <br />Governor <br />MEMORANDUM <br />3~cember 1983 <br />T0: Mike Savage J <br />FROM: Jim Pendleton <br />RE: Review of Trinidad sin Mining Company's Responses to <br />Stipulations r 14 & 15, Permit # C-048-81 <br />Pursuant to your request, I have completed a review of Trinidad Basin's <br />recent response to Stipulations N0. 14 & 15, placed upon their permanent <br />program permit # C-048-81. <br />Stipulation #14: <br />This submittal presents the result of a survey, performed to determine <br />the actual material balance at the TBM mine. The calculations allow <br />determination of the actual swell and bulking factors for the mined <br />overburden section. The applicant originally projected an overburden <br />swell factor of 16.0 percent and an overall bulking factor of 0.0 <br />percent. The applicant projected that overburden swell would exactly <br />equal the proportion of coal removed, resulting in approximate original <br />contour for the backfilled area. <br />Within the representative section surveyed (Pit 1), the following actual <br />material balance was determined: <br />Total Excavated Volume: 1,038,175 BCY(Bank Cubic Yard} <br />Total Coal Removed: 131,162 BCY <br />Total Excavated Overburden Volume: 90~T B~Y <br />Total Backfilled Volume: 1,038,175 LCY(Loose Cubic Yard) <br />Total Road (OB) Volume: 39,424 LCY <br />Total Swollen Overburden Volume: 1,077,599 LCY <br />Total Swollen Overburden Volume: 1,077,599 LCY <br />Total Excavated Overburden Volume: 907,013 BCY = 1.188 <br />Actual Overburden Swell Factor = 18.8 percent <br />Excess Overburden (Road) Volume: 39,424 LCY <br />Total Excavated Volume: 1,038,175 BCY = 0.038 <br />Actual Overall Bulking Factor = 3.8 percent <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.