Laserfiche WebLink
Division of Minerals and Geology <br />General Conditions for Purchase Orders <br />-DEFlNII'IONS <br />OWNER OR STATE -The Director of the State of Colorado, Division <br />of Minerals and Geology (DMG) or his designee. The Colorado <br />Division of Minerals and Geology (DMG) is located at 1313 Sherman <br />Street, Room 215, Denver, Colorntlo, 80203, telephone (303) 866• <br />3667. <br />PROJECT MANAGER -The Director of the Colorndo Division of <br />Minerals and Geology or the DMG employee or representative <br />responsible for day to day observation of project work at the job site, <br />and general comrnd administration for the DMG. <br />4. INSURANCE <br />The Contractor is required to procure and maintain the insurance <br />coverage listed below. Proof of insurance must be submitted on <br />certificates showing the following minimum coverage: <br />1. StarWartl Worker's Compensation and Employer Liability, <br />as required by State Statute including occupational disease, <br />covering all employees at the work site. <br />2. General Liability (Public Liability & Properly <br />Damage)(Minimum): <br />CONTRACTOR OR SELLER -The sole proprietorship, paMership, <br />or coryoretion to which the Purchase Order is addressed. <br />PURCHASE ORDER CONTRACT DOCUMENTS - An enforoeable <br />contract in mat H is written evidence of me purchasers acceptance of <br />me sellers previous and unretracted offer to perform me work subject <br />of me purchase order for me price stated merein. The Purohase <br />Order Contrect includes me Bid, bid Schedule, General Conditions, <br />Insurance Certificates, Purchase Order Terms and Conditions, Bid <br />Solicitation Memorandum, including Work Description, maps, <br />dawings and any AmentlmeMs These documents are <br />complementary, what is called by for any one document snail be as <br />binding as if called for by all. <br />In case of a difference between me contrect documents, precedence <br />shall be given in me following respective order. bid, Bid Solidtation <br />memorandum, General Conditions, Purchase Order Tertn s and <br />Conditions, maps and Drawings, Amendments shall take precedence <br />in me area of me bid document which mey modify or clarity. In me <br />case of any such-difference, me matter shall be promptly brought to <br />me attention of me PROJECT MANAGER who will make a <br />tletertnination in writing. <br />WORK -The material and/or labor me seller is to furnish to me <br />purchaser by operation under me purchase order. <br />SUBCONTRACTOR - A sole proprietorship, partnership or <br />corporation which has a unnhad calm me CONTRACTOR for me <br />performance of labor at me site of the work regardless of whemer <br />supptying of material is part of such contract, but without contractual <br />relationship to me purchaser. <br />SUPPLIER - A sole proprietorship, parfiership or cerpoation which <br />over-me-counter or under contract furnished me CONTRACTOR <br />material or equipment incrorporntetl in me work or omerwise incident <br />tome CONTRACTOR'S perfomance, but •xttich performs no labor at <br />me work site. <br />2 CONDRIONS AFFECTING THE WORK <br />In addition m examining me drawings and specifications, completion <br />schedule, and omer instructions, bidders shall visit me site and take <br />such omer steps as may De reasonably necessary to ascertain me <br />nature aril location of me work including avernge climatic conditions <br />and the general and local conditions which can affect me work or me <br />cost mereof. Failure ado so will not relieve bidders from <br />responsibility for estimating properly me difficulty or cost of <br />suaessfully pertortning me work. <br />AWARD <br />Award will be made with reasonable promptness, by written notice to <br />me low responsive and responsible bitlder whose bid meets me <br />requirements and criteria set form in me Invitation for Bid. These <br />criteria will include, Dut not be limited to me lowest GRAND TOTAL <br />PRICE, corroded rf necessary for ertors in pace extension anNor <br />atltlitidn, antl capability to meet me performance time requirements. <br />The GRAND TOTAL PRICE w%~IV be used for comparing bids only. <br />a. Combined single limit of $600,000 written on an <br />occurrence basis; <br />b. Any aggregate will not be less man St Million; <br />c. The contractor must purchase additional <br />insurance 'rf claims reduce me annual aggregate <br />below $600,000; <br />d. The State of Colorado must be named as <br />additional inaured on each comprehensive <br />general liability policy; <br />e. Certificates of insurance must be provitled to me <br />State wNhin 10 working days after receipt of <br />Award; and, <br />f. Insuance shall include provisions providing <br />notification to me State 10 days prior to <br />cancellation of me coverage. <br />Automobile Liability (Minimum). The contrndor must carry <br />a minimum of $600,000 combined single limit. <br />The State of Colorado MUST be named as an Additional Insured on <br />me certificate of insurance. An Additional Insured Endorsement <br />amentling such policy or polides must be presented tome DMG prior <br />to issuance of me Notice to Proceed. Bidders are advised to <br />consult with their insurance carrier eonceming these <br />requirements. Submit a bid only ff you are prepared tb complete <br />these requiremeMS. <br />WORK SCHEDULE <br />After a Purchase Order has been issued, me PROJECT MANAGER <br />will notify me Contactor. Under no dreumstances shall me <br />CONTRACTOR begin work before a P.O. is iswed. If me Bitl <br />Solidtation Memorandum specifies projed dates or a certain projed <br />schedule, me successful bitlder shall pertom 1he',vrLt during me <br />specifietl time penotl. DMG reserves me right to cancel me Pumhase <br />Order if me (iJnladbr fails to begin me work as scheduled. <br />6. ACCIDENT PREVENTION AND SAFET`I MEASURES <br />The Contractor shall comply calm applicable provisions of OSHA Part <br />1926, Conshuction Standards and Imerpretations, in effect on me <br />date of the Bid Opening. The Contractor shall contlnuously maintain, <br />at his expense, atlequate protection of me work and me. Principle <br />Representative's property, and shall take all prncticable precautions <br />in me interest of safety. <br />Any shafts which were fenced poor to construction activities Shall be <br />protected ~by a temporary fence during non-working hours, wimout <br />relieving me Contractor of its legal or contractual duties ro take safety <br />precautions. Other openings may be designated Dy me Project <br />Manager as requiring fencing due to pro>amity of houses or visitation <br />by tourists. <br />Work may involve activities around unprotected hazardous mine <br />shafts, slopes, atlits and omer openings which may be open to me <br />surface or hidden from view by fresh, debris, vegetation, or min antl <br />unstable layers of surficial materials or rock. The Contractor shall be <br />responsible for morougMy irnestigating me site conditions and <br />scheduling and directing his equipment, equipment operations, <br />personnel and safety procedures to prevent accldents and injuries. <br />Failure to comply will be cause for immediate suspension of me work. <br />