-24- <br />February 9, 1983 <br />- Eldon Str1d letter summarizing the Terror Creek situation. <br />February 14, 1983 <br />- Terror Creek permit application received. <br />February 15, 1983 <br />- Ed Bischoff site inspection. Berms, ditches and sediment pond <br />work had been completed, as directed by the Division. <br />February 23, 1983 <br />- Completeness letter sent out. <br />- Phone conversation with Eldon Strid. Stressed reclamation <br />feasibility and AVF as adequacy issues. <br />March 1, 1983 <br />- NOV written for failure to salvage all available topsoil. The <br />NOV was never issued. <br />March 14, 1983 <br />- Meeting with Eldon Str1d and Rick Chilton. Discussed reclamation <br />feasibility question and access road technical revision. <br />Mrch 28, 1983 <br />- Letter from Rick Chilton. Included haul road designs and access <br />information. <br />March 31, 1983 <br />- Additional topsoil and reclamation plan Information, and bonding <br />calculations submitted by Terror Creek. <br />April 7, 1983 <br />- Phone conversation with Eldon Strid. Requested information on <br />water rights and water use proSecttons, and permits and licenses <br />required by Highway Dept., and Bureau of Reclamation for <br />constructing bridge across Fire Mt. canal. Also reminded Eldon <br />that Terror Creek had offered to submit bond as indication of <br />good faith and discussed AVF issues. <br />