Laserfiche WebLink
Table 1: Summary of Affected Land - Map II - Financial Warranty Determinations <br /> lake upon completion of extraction activities. Map II shows the <br /> intended irregularity of the final shoreline, however, the actual size <br /> and shape of the lake will be determined by the nature and extent <br /> of the deposit material. Regardless, warranty considerations <br /> provide for planned 16.5233 acres of intended shoreline remaining <br /> above water level, plus 50 percent of the Amendment 2 pond area <br /> to be affected above ground, with the balance to be underwater <br /> before extraction advances on an acre for acre basis relative to <br /> land to water area thereafter. Soil reserves will be set aside to the <br /> Amendment 2 boundary, until a proportionate area of acres under <br /> water exceeds the soil required to that extent. <br /> 2 <br />