Laserfiche WebLink
~• Stipulation No. 18 ~ '~~' ~~~~ PL Yit~ /Q~C:-S {.r <br />THE DIVISION DIRECTS MCC TO COMPLETE A DETAILED ANALYSIS OF THE POTENTIAL ~~!'~S~•~,<iJ'~ <br />EFFECTS UPON THE SLOPE STABILITY OF THE LANDSLIDE DEPOSITS ADJOINING <p;;_:~,;~ ~ <br />BEAVER RESERVOIR. MCC SHALL INSTALL AND MONITOR AN APPROPRIATE SET OF 'I <br />MONUMENTS ON THE LANDSLIDE DEPOSITS IN ORDER TO OBSERVE THE POTENTIAL "~,~,~jS pti/(~] <br />DISPLACEMENT OF THE LAND FORM. THE DETAILED ANALYSIS SHALL BE COMPLETED <br />AND SUBMITTED TO THE DIVISION FOR REVIEW, PRIOR TO REQUEST FOR APPROVAL ~d ~-~ D(~(-~C <br />TO EXTRACT COAL BENEATH THE LANDSLIDE DEPOSITS ADJOINING BEAVER <br />RESERVOIR. ~~ Pw~2~ i ~ <br />Because the permit area boundary still includes Beaver Reservoir and the ~~ `~ <br />adjoining landslide deposits, the stipulation status will remain "future." <br />STATUS: Future <br />1,,~~,~Stipulation No. 19 <br />~ ~leuf ~ THE DIVISION DIRECTS MCC, AS A PORTION OF ITS SUBSEQUENT PERMIT <br />~Byvt~ ~ ~ APPLICATIONS FOR THE MINE, TO SUBMIT REVISED SUBSIDENCE EVALUATIONS. TH~ I"Lbd 6I~ <br />bbb ~ ~,D SUBSIDENCE EVALUATION FOR EACH PERMIT PERIOD REQUESTED SHALL INCORPORATE ~ I~ <br />N)I Q THE RESULTS OF SUBSIDENCE MONITORING AND THE LANDSLIDE STABILITY STUDIES d,~,Su/tN~ <br />~~ COMPLETED TO DATE, AS STIPULATED ABOVE. PARTICULAR ATTENTION SHALL BE ldM ~ sl~~. <br />~~ \~ ~ ~ MOININGDBENOEATHECRITICADL AREASaRINC6UDINGSTHE DRY OFORKROFDMINNESOTAECREEK, (~ L~5 ~I OYL <br />~~~ ~,f~~ AMOENDEDVSUBSIDENCEIEVANUATIONSASDHALLDINOCLUDEITHEAPROPOSAL OF APPROPRIATE Vl'~~~~ ~ ~£ <br />V~ SUBSIDENCE MONITORING NETWORKS WITHIN EACH OF THESE DESIGNATED AREAS. ~?~~j,y G(~:`/X <br />The stipulation refers to areas which are still a part of the life-of-mine <br />permit area. Until these areas are eliminated or the stipulation commitment ~SS~~ S <br />is incorporated into the narrative of the permit application, the stipulation <br />status will remain "future." <br />STATUS: Future <br />Stipulation No. 20 <br />THE DIVISION DIRECTS MCC TO LIMIT EXTRACTION WITHIN THE DEFINED "CRITICAL <br />AREA BUFFER ZONES" BENEATH THE DRY FORK OF MINNESOTA CREEK AND LICK <br />CREEK, AS DEPICTED ON MAP 50 (FORMERLY EXHIBIT 3.4.4.6.1), TO NO MORE <br />THAN THIRTY (30) PERCENT OF THE IN-PLACE COAL. <br />STATUS: Terminated <br />Stipulation No. 21 <br />7HE APPLICANT MUST INSTALL MONITORING WELLS IN, CONDUCT PUMPING TEST ON, <br />AND MONITOR WATER LEVELS AND WATER QUALITY IN THE ALLUVIUM OF DRY FORK, <br />LICK CREEK, SOUTH PRONG AND HORSE CREEK ONE YEAR PRIOR TO MINING WITHIN <br />THE WATERSHEDS OF THESE STREAMS. THE APPLICANT SHALL SUBMIT TO THE <br />DIVISION THE DATA AND RESULTS OF THESE TESTS AND MONITORING ALONG WITH <br />PROJECTED IMPACTS PRIOR TO CONDUCTING MINING WITHIN ANY OF THE WATERSHEDS <br />-~- <br />