Laserfiche WebLink
Mr. and Mrs. Tatum indicated they were concerned about the revegetation of the site and <br />that not enough time had passed for a determination of revegetation success. OMG <br />inspector Gorham.explained that the Phase I bond release process only considers the <br />completion of the backfilling, grading, and drainage control and whether those tasks were <br />completed in accordance with the approved plan. The completion of the sealing of the shaft <br />must also be included. in the evalu~fion and future evaluation will be conducted in the office. <br />The Tatum's reiterated the objections documented in their letter dated February 17, 2005. <br />The Tatum's expressed an interest) in testing water level in an adjacent well. Inspector <br />Gorham indicated that the water level in the subject well had been rerently documented in <br />an inspection report and agreed to,provide a copy of this report to the Tatum's. <br />4 <br />LS 39dd Wnldl WIC 65S09V86TL 0055 L00L/6Z /60 <br />