Laserfiche WebLink
.~ <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Fesources <br />7313 Sherman St., Foom 2t5 <br />Denver. CO 80203 <br />303 866 3567 <br />Fnx 303 832-Bt06 <br />STAT~OF COLORADO ~~ <br />OF COO <br />~~" - 9> <br />-`"'18 <br />w~. <br />• P~~ <br />. F" <br />~ ~8 ]6 ~ <br />Roy Romer, <br />Govemo~ <br />Fretl R Banta. <br />Dnision Deegor <br />June 12, 1990 <br />Mr, W,D. Lamoreux <br />First National Bank of Florence <br />P.O. Box 389 <br />F]orence, Colorado 81226 <br />RE: La Plata Mine Reclamation <br />File: C-87-072 <br />Dear Mr. Lamoreux: <br />I spoke to Dave Patch on June 8 and he indicated that he planned to finish <br />portal bench and access road backfilling by the end of this week, and then <br />temporarily suspend work at the La Plata site until later this summer. As I <br />believe you are aware, Carl Strohecker has requested that the house trailer <br />owned by Frank Smith and the bench on which it sits along with associated <br />water, sewer and electrical facilities remain as is. The Division is <br />authorizing a modification to the reclamation schedule as set forth in the <br />Letter of Agreement to allow for retention of the trailer and associated <br />facilities as requested. <br />Assuming that portal bench and portal access road backfilling have been <br />completed, tasks that remain to be done are listed below: <br />- Demolition of conveyor and conveyor supports, regrading of the <br />drainage beneath the conveyor and regrading of the conveyor access <br />road. <br />- Sealing of the two monitoring wells adjacent to the regraded leach pad <br />and sediment pond. The well located adjacent to the topsoil stockpile <br />in the draw west of the minesite will remain as is. <br />- Implementation of acceptable sediment controls on the north side of <br />the county road. <br />- Topsoiling the lower bench facilities area and revegetation of aTl <br />disturbed areas. <br />The remaining activities will need to be initiated no later than September 15, <br />1990 and completed no later than October 15, 1990 as specified in the Letter <br />of Agreement. Phase I bond liability release cannot be granted until <br />demolition and removal of the conveyor has been completed and the conveyor <br />access road and the drainage segment beneath the conveyor have been regraded. <br />