Laserfiche WebLink
<~ <br /> <br />5. LEWIS GULCH FILL <br />a) Remove fill, pipe, etc.(pipe salvaged to Kessler <br />Reclamation) <br />b) Place ~ 1000cy. adjacent to access road <br />c) Grade Gulch slopes <br />d) Seed & Mulch <br />e) Furnish & place silt fencing, estimate based on 3001f @ <br />1.5/lf. <br />TIME TO COMPLETE ITEM 5 <br />6. PHASE II RECLAP9ATI0% <br />----- ~ 10 WORK DAYS <br />- a) Grade Erosion Control Dam-(Remove-Sedimentation Pond)- <br />b) Backfill Bench Sedimentation Pond <br />c) Seed & Mulch <br />d) Periodic Reseeding <br />TIME TO COMPLETE ITEM 6 ---------------------- <br />---------------------------------------------------------------- <br />TOTAL TIF7E TO COI~YPLETE TWI% PI%ES F'(I%E SITE --- ~ 72 63ORK DAYS <br />TWI% PI%ES COAL SALES <br />1. REA4OVE EOUIPFIEAIT & MISCELLANEOUS <br />a) Remove tipple & foundations <br />b) Remove scales <br />c) Remove & dispose of concrete <br />d) Remove shop building and slabs <br />e) Remove & dispose of coal stockpiles <br />f) Remove miscellaneous remaining equipment <br />TIME TO COMPLETE ITEM 1 ---- <br />2. BULB EXCAVATION b GRADI%G <br />67 WORK DAYS <br />a) Grade downslope of tipple bench, 500 cy. ± <br />b) Remove ramp & spoil pile, backfill tipple access, 6,OOOcy.± <br />c) Backfill toe of existing slope 1,OOOcy± <br />d) Scafify & grade yard area <br />TIME TO COMPLETE ITEM 2 ------------------- .': 28 WORK DAYS <br />3. SEED ~ FNLCH <br />a) Completed fill slopes <br />b) Yard Area <br />