Laserfiche WebLink
ocr;FlVFp <br /> <br />MAY 0 2 1995 <br />T6dIN PINES NO. 2 A7INE <br />RECLAMATION SCHEDULE <br />APRIL 30, 1995 <br />UIVI$UII VI ryIIIIUIQI68liB0 <br />a8Y <br />THE ESTIMATED TIME FOR COMPLETION OF WORK ITEMS FOR TWIN PINES NO. <br />2 MINE IS AS FOLLOWS: <br />1. SEAL A4INE OPENINGS <br />a) Complete fill in entries <br />b) Remove liner plate, grade slope <br />c) Seed & Mulch regraded slope <br />TIME TO COMPLETE ITEM 1 ----------------------- w 12 WORK DAYS <br />2. NORTH SPOIL AREA <br />a) Repair grading @ north end of upper and lower benches <br />adjacent to original ground; <br />b) Prepare slopes seed & Mulch <br />3. ACCESS ROAD TO NORTH SPOIL AREA <br />a) Complete Grading & Scarify Road Bed <br />c) Seed & Mulch Drainage Way <br />TIME TO COMPLETE ITEM 2 & 3 ------------------- ~ 3 WORK DAYS <br />4. 1~IINE YARD ~ UPPER BENCH AREAS <br />a) Remove shop slab; burry in portals; <br />b) Remove water tank & haul to yard in Rockvale; <br />c) Remove substation & haul to yard in Rockvale; <br />d) Stockpile 1,200 cubic yards for pond backfill; <br />e) Dispose of all oil cans & barrels & other trash; receipt <br />required from disposal company accounting for all <br />containers; <br />f) Excavate, load, haul, & place approximately 2,800 <br />cubic yards of material from Lewis Gulch place on slope at <br />mine bench; <br />fi) Load, haul, and place on bench 800 cubic yards of top <br />soil from access road on mine bench; reclaim top soil <br />sites; <br />g) Grade Upper Bench; <br />h) Construct Cobblestone dikes, 265 tons; <br />i) Grade Middle Bench, remove road, & blend slope; <br />k) Install cobble stone slope drain; <br />1) Build up berms <br />m) Build Cobblestone detention structure, 75 tons <br />n) Furnish & install approximately 1000 ft. of silt fence; <br />o) Scarify, Seed, & Mulch; <br />p) Furnish & build 550 feet of 4 stand barbed wire fence; <br />TIME TO COMPLETE ITEM 4----------------------- ~ 57 WORK DAYS <br />