Laserfiche WebLink
,.._ <br />-4- <br />Stipulation No. 14: <br />THE DIVISION DIRECTS TRINIDAD BASIN MINING TO SUBPI7T T/IE DATA AND <br />ANALYSIS OF OVERDURDEN SWELL AND MATERIAL DALANCES RELIED UPOJJ BY <br />THE COMPANY TO PROJECT OVERBURDEN SWELL FACTORS FOR TffE TRINIDAD <br />BASIN MINE. THIS INFORMATION AND A REPORT OF TffE ANALYSIS SlIALL <br />BE SUBPIITTED TO THE DIVISION FOR REVIE{9 WITHIN 30 DAYS FOLI,O4JING <br />APPROVAL OF TFIE PEIL'fIT. TIfIS INFORMATION SIIALL IIJCLUDE DISCUSSION <br />OF PREVIOUS PIT VOLUMES, PRE^ AND POST-PIINING TOP0GRAP1fY OF <br />PREVIOUSLY MINED AREAS, INCLUDING PROPOSED AND EXISTING ROAD <br />CONFIGURATIONS, AND OVERBURDEN STRATIGRAPIIY AND SWELL CIfARACTERISTICS, <br />AT A MINIMUPI. P1I117NG SHALL NOT PROCEED BEYOND CUT NO. 13 OF PZT <br />N0. 4 PRIOR TO WRITTEN APPROVAL BY THE DIVISION OF TNIS ANALYSIS. <br />Stipulation No. 15: <br />THE DIVISION DIRECTS TRINIDAD BASIN MINING C014PANY TO A14EJJD ITS <br />POST-PfI1JINC TOPOG}LIPHIC MAPS AND APPROPRIATE PERMIT APPLICATION <br />NARRATIVES TO SPECIFICALLY DISCUSS ITS PLAN TO ACCOMMODATE TIfE <br />PROJECTED BACKFILL PATERIAL BALANCE RESULTS PORTRAYED IN CORRECTED <br />TABLE V-1 OF T(fE AMENDED PERMIT APPLICATION. <br />THESE APPLICATION AMENDMENTS S/fALL BE SUBPIITTED TO THE DIVISION <br />FOR RCVIEW NO LATER THAN 60 DAYS FOLLOWING APPROVAL OF T1fE <br />PERMIT. MINING Sf1ALL NOT PROCEED BEYOND CUT NO. 13 OF PIT <br />NO. 4 PRIOR TO WRITTEN APPROVAL BY THE DIVISION OF THESE <br />AMENDMENTS. <br />Stipulation No. 16: <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PE121•fI TTEE {JZL7, SUBI4IT A <br />HAUL ROAD RECLAMATION PLAN TO TFIE DIVISION 19/IICH WILL ADDRESS <br />RECLAMATION OF TlIE PIT 1J0. 1 11AUL ROAD. THIS PLAfJ [911,7„ AT A <br />PfINIIdUM, ADDRESS APPLICABLE DESIGN CRITERIA OF 4.03 FOR TIfE ROAD <br />TO BE LEFT, PLANS FOR TOPSOILING AND SEEDING, AND A DE7-0ONSTRA TION <br />THAT THE MATERIAL LEFT IN TllE ROAD BASE f97LL NOT CAUSE A PATERIAL <br />SHORTAGE ELSE19flERE ItJ TILE PERPfIT AREA. T1f75 PLAN AND RECLA~~lATION <br />ACTIVITIES SHALL BE IPIPLEPIENTED IMI4EDIATELY UPON APPROVAL BY TffE <br />DIVISION. <br />Stipulation No. 17: <br />WITIfIN 90 DAYS AFTER PERMIT ISSUANCE, TRINIDAD BA.S IN MIIJING S1fALL <br />SUBMIT TO TlIE DIVISION A CERTIFICATION DOCUPfENT 191fICI1 STATES T!!AT <br />ALL RAUL ROADS i9ERE CONSTRUCTED OR RECONSTRUCTED IN ACCORDANCE [9ITlI <br />T((E PLAN CONTAINED IN TfiE APPROVED MLRD PERAfIT APPLICATION. T(lE DOCU- <br />MENT SIfALL BE CERTIFIED BY A QUAI•IFI ED REGISTERED PROFESSIOIJAL <br />ENGINEER. T177S CERTIFICATION DOCUIfEN'1' ZS ALSO RIi ~~UIRED TO DE <br />SUBMITTED AFTER CONSTRUCTION OF ANY NE[9 ffAUL ROAllS AT T11E MINE. <br />Stimulation No. 18: <br />THE PERMITTEE IS REQUIRED TO I1•fMEDIATELY INCORPORATE ALL PREVIOUSLY <br />APPROVED SUBMITTALS REGARDING THE TRINIDAD LOADOUT FACILITY ZtJT0 <br />THIS PERMIT DOCUf9ENT, AND IS BOUND TO FOLL0t9 THE OPERATION P.ND <br />RECLAMATION PLAN PREVIOUSLY APPRGVED DY TItE DIVISION. <br />