Laserfiche WebLink
ATTACHMENT A <br />The stiQulations to the Trinidad Basin Mine Mining and Reclamation <br />Permit N C-048-81 are: <br />Stipulation No. l: <br />WITHIN 30 DAYS OF PERIIIT ISSUANCE, T1/E PER/fITTEE SHALL OBTAIN AND <br />SUB142T TO THE DIVISION [/RZTTEN COPfMENTS ON TILE PROPOSED POST-192NZNG <br />LAND USE OF RANGELAND AND WILDLIFE HABITAT FROM HR. JOHN WICGINS <br />AND MR. ALVIN WIGCINS. <br />Stipulation No. 2: <br />WITHIN 120 DAYS AFTER PERPfIT ZSSUA NCE, ALI, SEDIPIENTATION PONDS <br />SHALL BE CERTIFIED BY A QUALIFIEU REGISTERED PROFESSIONAL ENGINEER. <br />THE CERTIFIED REPORT SfIALL STATE THAT THE PONDS WERE CONSTRUCTED <br />IN ACCORDANCE WITH THE APPROVED PLANS CONTAINED IN THE APPLICATION. <br />Stipulation No. 3: <br />THE OPERATOR SIIALL P10NITOR GROUND I/ATER AS OUTLINED IN T!!E FOLLOWING <br />TABLES. ALL MONITORING DATA SHALL BE SUB1fITTED TO TBE DIVISION IN <br />A SINGLE ANNUAL REPORT. <br />TABLE 1. M0NITORZI/G FREQUENCIES <br />WATER LEVEL FIELD MEASUREPIENT LABORATORY MEASUREMENT' <br />WELL NUMBER PfEAS UREPIENT FREQUENCY FREQUENCY (SEE TABLE 2) FREQUENCY (SEE TABLE 3; <br />W1 Monthly Monthly Quarterly <br />W2 PtonthIy Pfontl[ly --- <br />W3 Monthly Monthly --- <br />W4 Plonthly lfonthly --- <br />WB 1•fonthly Monthly --- <br />S-2 Monthly Monthly Quarterly <br />TABLE 2. FIELD PEASUREPIENT CHEMICAL PARAl1ETERS <br />PH <br />CONDUCTIVITY <br />TEMPERATURE <br />TABLE 3. LABORATORY MEASUREPIENT CHEMICAL PARAPIETERS <br />pH SODIUI.1 <br />CONDUCTIVITY SULFATE <br />TEMPERATURE ARSENIC <br />TOTAL DISSOLVED SOLIDS CADPfIUP1 <br />BICARBONATE IRON <br />CALCIUM MANGANESE <br />PfAGNESI UM PiERCURY <br />NITRATE-NITRITE SELENIUM <br /> ZINC <br />