Laserfiche WebLink
- <br />BATEMAN ENGINEERS INC <br />GOLDER ASSOCIATES INC <br />CRESSON PROJECT <br />JOB 943-2720 <br />JULY, 1994 <br />AREQUA GULCH WASTE DUMP AREA BELOW HIGHWAY 67 <br />DESIGN STORM DEWATERING SCHEME <br />PHASE I LEACH PAD <br />Design Storm 100 year-24 hour (inches) <br />Drainage Area (acres) <br />Runoff=Rainfall (inches) <br />TOTAL STORM WATER VOLUME (ac-ft) <br />Dewatering Pump Capacity (ac-ft/day)(24 hour day) <br />3.5 <br />48.0 <br />3.5 <br />14.0 <br />4.4 <br />DAYS REQUIRED TO DEWATER (1000 gallon per minute pump) 3.2 <br />