Laserfiche WebLink
M. <br />to be reclaimed, and the methods and mechanics of earthmoving? <br />(H) Has the Applicant proposed a grading plan that will create a final <br />topography that is appropriate to the final land use of cropland? <br />(I) Has the Applicant proposed a backfilling and grading plan with <br />reasonable timetables that is consistent with good mining and <br />reclamation procedures? <br />(J) Has the Applicant proposed a plan to handle and dispose of refuse <br />in a manner that will control unsightliness? <br />(K) Is the proposed financial warranty amount set at a level that reflects <br />the estimated costs of completing the reclamation plan? <br />(L) Has the Applicant adequately addressed the requirements of <br />Construction Materials Rule 6.4 8 (wildlife information)? <br />Construction Materials Rule 6.4 ]0 (vegetative information)? <br />Construction Materials Rule 6.4.11 (climate)? <br />(M) Has the Applicant provided a description adequate to satisfy the <br />seeding and fertilization requirements of Construction Materials <br />Rule 6.4.5(2)(f)(ii) and (iii)? <br />(N) Has the Applicant addressed secondary containment for hazardous <br />material and/or waste? <br />A. <br />Adequacy ofApplication to Determine Impacts to Surface and Groundwater <br />SVStems and Impacts to Prevai[inn Hvdro[oQic Bnlance <br />if an operation is expected to directly affect surface or groundwater <br />systems, Construction Materials Rule 6.4.7 requires an applicant to submit <br />