Laserfiche WebLink
Rule 2.04.7(1)(b) <br /> 3. If necessary, please update Section 2.7.5.4 on pages 2-524 through 2-524j to account for any <br /> new wells drilled within one mile of the permit area. <br /> Rule 2.04.7(4)(a) <br /> 4. If necessary, please update map M-31 to show the locations of any new wells drilled within one <br /> mile of the permit area. <br /> 5. If applicable, please update map M-31, "Water Rights." <br /> Rule 2.04.7(4)(b) <br /> 6. Please update map M-30A to include all NPDES points. Also, map M-30A shows only one <br /> current surface water monitoring site, S-1. Are there more such sites? If so, please add them <br /> to map M-30A. <br /> 7. On page 2-414a, reference is made to map M-30B for the location of flume S-3. It appears <br /> that this reference should be changed to map M-30. <br /> Rule 2.04.7(4)(d) <br /> 8. On page 2-4141 of the permit, reference is made to maps M-31A and M-31B concerning the <br /> location of the stock ponds. It appears that maps M-31A and M-31B have been consolidated <br /> into map M-31. Please change this reference. <br /> Rule 2.05.3(2)(a) <br /> 9. If applicable, please update map M-4, "Life of Mine Plan," the pit disturbance shown on <br /> map M-3, "Pre-Mining Topography," and map M-10, the yearly "Mine Plan." Also, the pit <br /> area disturbance line on map M-3 does not appear to coincide with the mining limit line on <br /> map M-4. Please explain this difference. <br /> 10. Please update the mining sequence descriptions of the various pit mining areas, found on <br /> pages 3-15 and 3-15a. <br /> 11. On page 3-45 of the permit application, please update the status of the highwalls. <br /> 12. If applicable, please update Table 3.1-3, "Approximate Yearly Disturbance and Reclamation in <br /> Acres by Phases," found on page 3-13. <br /> 13. Please update Section 3.1.4.1, "Mining Sequence," on pages 3-15 and 3-15a for the various pit <br /> areas. <br /> 5 <br />