~;evisicn to Section 2.05.4 <br /> <br />The following costs were used to calculate the reclamation bond. <br />The monthly rental rate was obtained from Wagner Equipment in Hayden. <br />Most of the equipment will 6e used on a monthly basis. The hourly <br />rate was increased 12b to allow for a slightly higher cost. <br />Equipment hours were calculated using a 7.5 hour day. <br />Building Removal Costs <br />Concrete Removal <br />A cat 235 backhoe rents for 96.41 hr. Using the agreed on production <br />rates, the concrete breaking costs would be: <br />67.5 hours backhoe time 56,508 <br />72 operator hours ($c0/hr.) 1,44 <br />TOTAL 7,948 <br />Using a cat 992C fron oend loader, which rents for 239.63/ hour, the <br />loading costs would be: <br />5 hours front-end loader $1,198 <br />5 operator hours ($20/hr.) 100 <br />1,298 <br />The concrete can be hauled with an International 350 payhauler, which <br />rents for $111.49: <br />5 hours truck time $ 557 <br />5 operator hours ($20/hr.) 100 <br />657 <br />Metal Building Removal <br />Using the approved $.22 per cubic foot of building space, the costs are: <br />Shop-Warehouse 176,000 Ft.3 _ $38,720 <br />Steam Cleaner Building - 1,820 400 <br />39,120 <br />Revised September, 1984 <br />