Laserfiche WebLink
Table 2 <br />Surface Water Monitoring <br />Site Name Discharge Water Quality" <br />YSSF3 Continuous Monthly/Triannual <br />YSS2 Monthly Monthly/Triannual <br />YSGFS Monthly Monthly/Triannual <br />YSGS Triannuala Trainnala <br />NPDES Sites See Paqe 25 <br />Springs <br />YSSPGI Semiannual Semiannual <br />Discharge measurements (both continuous and monthly) will be conducted March - <br />October only. <br />Water Quality Monthly = field parameters only (pH, temperature, and electrical <br />conductivity), March through October only. <br />Water Quality Triannual = Water samples will be analyzed according to the surface <br />water parameter list as given in the permit in Table 15-5 during snowmelt runoff <br />(April), post-runoff (May or June), and baseflow (September). <br />Semiannual is May/June and September/October, and includes field parameters and <br />the list of parameters in Table 9 of this document. <br />"If flow is less than 5 gallons per minute, then only field parameters will be <br />measured. <br />sFor site YSGS, triannual discharge measurements and water quality samples (total <br />dis~ol~ed ~clide^` ..ill take place du «.^.^y "^a y, July. ~.nd Sep*_embe_. <br />Yoast Mine 43 August 3, 2005 <br />