My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39774
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:08 PM
Creation date
11/23/2007 10:21:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
8/3/2005
Doc Name
Proposed Decision & Findings of Compliance for RN2
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Hydrologic Balance -Rule 4.05 <br />A. Water Quality Standazds and Effluent Limitations <br />All discharges of water from the Yoast mine site from storm runoff, pit <br />pumpage, water treatment facilities, and spoil springs will pass through a <br />sediment pond designed to ensure that all dischazges meet effluent limits in <br />Seneca Coal Company's NPDES permit for the Yoast Mine. A storm water <br />permit and Spill Prevention, Control and Countermeasure (SPCC) plan <br />associated with the NPDES permit also dictate preventative and mitigation <br />measures for ensuring that all water leaving the mine site meets applicable <br />effluent limits. <br />The Division proposes to grant a small area exemption from use of sediment <br />ponds due to the limited size of the area and due to the fact that ponds and <br />treatment facilities are not necessary for the drainage to meet the effluent <br />limitations of Rule 4.05.2 and applicable State and Federal water quality <br />standards for receiving streams and also due to the fact that no mixing of <br />surface drainage with a discharge From underground workings will occur. <br />The small azea to be exempted is designated as Topsoil Pile L located on <br />Exhibit ]2-1. (4.05.2(3)(b)(i)). <br />B. Diversions and Conveyance of Overland Flow <br />Three collection ditches were planned for the first five year permit term. <br />Diversion No. 1 was never built. Diversion No. 2 routes disturbed area <br />runoff, from Topsoil Stockpile A, to Pond 10. Diversion No. 3 was designed <br />to carry disturbed azea runoff around the explosives storage azea, through <br />Armand Draw to Pond 10. Diversion No. 3 has been removed from the permit <br />application package. Designs for Diversion No. 2 aze located in Attachment <br />13-2 of the permit application package. <br />Permanent drainages will be reconstructed in mined azeas, to approximate the <br />original drairage density. Drainages to be reconstructed are designed to <br />safely pass runoff from the predicted 10-year, 24-hour precipitation event. <br />Details of permanent drainage designs aze located in Tab 13 and 20 of the <br />permit application package. <br />There aze no variances from the requirements of the Rules and Regulations <br />proposed at this time. Therefore, no specific findings regarding diversions <br />have been made. <br />Yoazt Mine 23 August 3, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.