Laserfiche WebLink
5. The permit area, except for the combination haul/access road, is not <br />within 100 feet; measured horizontally, of the outside right-of-way of <br />any public road: <br />XXVI: Demonstration that Surface Coal Mining and Reclamation Operations can <br />The Division finds; based on information in the application and the operator's <br />compliance with the Act and regulations; that coal mining and reclamation <br />operations can be feasibly accomplished under the mining and reclamation plan <br />contained in the application: <br />XXVII. Compatibility with Anticipated Adjacent Operations - Rule 2.07.6(2)(i) <br />The Division finds that the King Coal Mine will not be inconsistent with other <br />operations anticipated to be performed in areas adjacent to the permit area: <br />XXVIII: Reclamation Fees Required by 30 CFR; Chapter VII; Sub-chapter R - <br />The Division has been notified by the Office of Surface Mining (OSM) that as <br />of June 8; 1987 National King Coal was X17;152.33 in arrears for unpaid <br />reclamation fees and accumulated interest: National King Coal filed for <br />protection from its creditors under Chapter 11 of Title 11 filing on <br />January 26, 1987. A schedule to repay these fees will be administered by the <br />bankruptcy judge: <br />Since filing for Chapter 11 bankruptcy protection, National King Coal is <br />current in paying the required reclamation fees; the first quarter 1987 fees <br />were paid according to the OSM representative. <br />The operation is in compliance with the requirements of this section: <br />/v j r <br />0211E <br />-25- <br />