My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39719
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:06 PM
Creation date
11/23/2007 10:19:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
8/15/2005
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mid-Term Review <br />Roadside North and South Portals Mine, Permit No. C-81-041 <br />INTRODUCTION <br />This document presents the results of the Division's mid-term review for the Roadside Portals Mine. <br />This review was conducted to fulfill the requirements of Rules 2.08.3, 2.06.2(10), 2.06.3(4), <br />2.06.5(3), 2.06.7(5), and 3.02.2(4). The review consisted of a review of the permit application <br />package, previous findings documents, and annual hydrology and reclamation reports, as well as <br />revisions, stipulations, inspection reports, and enforcement actions issued since the most recent <br />permit renewal. The current permit renewal proposed decision was issued August 26, 2003. <br />Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that experimental practices, mountaintop removal <br />variances, steep slope variances from AOC, and variances trom contemporaneous reclamation for <br />combined surface and underground mining be reviewed by the Division where applicable. None of <br />these categories apply to the Snowcap Coal Company, Inc. (SCCI operation. <br />Rule 2.08.3 requires that the Division conduct a review of each permit issued prior to its mid-term. <br />Based on this review, for good cause shown, the Division may require reasonable revision. or <br />modification of the permit provisions to ensure compliance with the Act and Regulations. See Section <br />III of this document. <br />Rule 3.02.214) requires that the Division review the amount of the bond and the terms of acceptance <br />of the bond every 2 1/2 years. See Section IV of this document. <br />The document is organized as follows: Section I is a brief mine status review. Section II summarizes <br />revisions to the permit since the last renewal and lists any stipulations and responses since renewal. <br />Section III is a summary of any changes or revisions that need to be made to the permit and the <br />justification for those changes. Section IV discusses the current state of the bond liability and the <br />reclamation bond. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.