My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39685
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:04 PM
Creation date
11/23/2007 10:18:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
General Documents
Doc Date
9/24/1992
Doc Name
A TRAFFIC IMPACT ANALYSIS FOR GOSNEY AND SONS INC GRAVEL PIT EXPANSION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />t Flint Engineering and Construction, serves gas and oil industry <br />Big A, serves gas and oil industry <br />' Aztec Well Service, serves gas and oil fields <br />Four Corners Wel] Service, serves gas and oil fields <br />4-Way, pipeline laying for oil and gas industry <br />t 4/4, pipeline laying for oil and gas industry <br />' These firms and others operate vehicles that significantly contribute to the <br />wear and tear of CR 521. <br /> <br /> <br />PROPOSED CONDITIONS <br />' It is proposed to expand the current gravel pit extraction operations to the <br />north into the Lucero property and into the eastern portion of the present site. <br />' It is also proposed to extend the gravel pit extraction operations into the Glen <br />' Williams Allotment property south of the existing gravel pit site. In addition, <br />' it is proposed to move the shop and parking operations presently located in <br />Bayfield to the existing gravel pit site. The Lucero site should contain <br />' approximately 442,000 cu yds of insitu aggregate. The eastern pit should <br />contain approximately 108,000 cu yds of insitu aggregate and the southern pit <br />should contain approximately 339,000 cu yds of insitu aggregate. The insitu <br />' aggregate in all of the expansion sites equals 889,000 cu yds total. <br /> <br />It is the intention of Gosney & Sons, Inc. to extract approximately 500,000 cu <br /> <br /> 11 <br />' <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.