My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39630
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39630
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:01 PM
Creation date
11/23/2007 10:16:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
General Documents
Doc Date
7/30/1986
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mid-Term Review <br />Red Canyon Mine <br />C-81-034 - <br />Introduction <br />'This document presents the results of the Division's mid-term review of the <br />Grand Mesa Coal Company's Red Canyon Mine. This mid-term review was conducted <br />to fulfill the requirements of Rules 2.08.3, 2.06.2(9), 2.06.3(4), 2,06.5(3), <br />2.06.7(5) and 3,02.2(4). <br />Rule 2.08.3 requires that the Division conduct a review of each permit issued <br />prior to its mid-term. Based on this review, for good cause shown, the <br />Division may require reasonable revision or modification of the permit <br />provisions to ensure compliance with the Act and Regulations. <br />Rules 2.06.2, 3, 4, 5 and 7 require that experimental practices, mountaintop <br />removal variances, steep slope mining, variances from AOC and variances from <br />contemporaneous reclamation be reviewed by the Division where applicable. The <br />Red Canyon permit does not include any operations under these variance <br />categories. <br />Rule 3.02.2(4) requires that the Division review the amount of the bond and <br />the terms of acceptance of the bond every 2 1/2 years. <br />The mid-term review consisted of a detailed review of the Red Canyon findings <br />document and permit application to identify any items that may have been <br />overlooked during the initial review. The Division also reviewed all <br />subsequent revisions and stipulation responses to ensure that all permit <br />commitments and conditions were being followed. Hydrologic monitoring data <br />were reviewed in conjunction with the review of baseline data to assess the <br />adequacy of the monitoring plan and discussion of hydrologic impacts. <br />Finally, the Division has conducted recent on-site inspection of the mine in <br />addition to a detailed review of past inspection reports to ensure consistency <br />of the mine plan with field conditions and to identify any potential <br />on-the-ground problems requiring attention. <br />This document is organized as follows: Section I provides a summary of the <br />current mine permit status. Section II includes a listing by category of what <br />items need to be revised, a rationale for requiring these revisions and <br />timetables for completing these revisions. Section III summarizes the <br />revisions to the permit processed to date and the action taken by the <br />Division. Section IV presents a summary of the status of the stipulations <br />attached to the Red Canyon Permit C-81-034 and any revisions required with <br />regard to the stipulations. Section V presents the results of the bond review <br />required under Rule 3.02.2(4). <br />
The URL can be used to link to this page
Your browser does not support the video tag.