My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39620
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:01 PM
Creation date
11/23/2007 10:16:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
1/23/1998
Doc Name
Adequacy Letter on Certification/Gob Pile Haul Road
From
DMG
To
BOWIE RESOURCES LIMITED
Permit Index Doc Type
ROADS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiiiiiihi <br />STATE OF COLORADO <br />DIVISION Of MINERALS AND GEOLOGY <br />Departmem of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone: 1703) 8663567 <br />FAX: (3031872-8106 <br />January 23, 1998 <br />Mr. William A. Beaz Jr. <br />Bowie Resources Limited <br />Bowie No. 2 Mine <br />P.O. Box 483 <br />Paonia, Colorado 81428 <br />~4~ <br />p-: <br />:fi; <br />DEPARTMENT Ok" <br />NATURAL... <br />RESOURCES . <br />Rov Romer <br />Governor <br />lames S. LOChhead <br />Eaecwive Dueaor <br />Michael 8. Long <br />Division Director <br />RE: Haul Road Cetification, Bowie No. 2 Mine, Permit No. C-96-083, Bowie Resources <br />Limited. <br />Dear Mr. Beaz: <br />The Division has received the haul road certification, certified on January 9, 1998, for the haul <br />road segment that goes along the old railroad bed from the paved main haul road to the gob pile. <br />The Division believes that the certification may need additional information. <br />If the railroad subgrade had been constructed in any way, the Division would like the <br />certification to include a statement of whether or not the railroad subgrade meets the performance <br />standards of Rule 4.03.1. This requirement is stated in Rule 4.03.1(d)(ii). The Division is using <br />the interpretation that the railroad subgrade is acting essentially as a haul road which had been <br />constructed prior to August 1, 1995. Along with this addition to the certification, the Division <br />also believes that a little more discussion would be in order, in addition to what has already been <br />stated in the certification, of why these performance standazds have been met for the railroad <br />subgrade. <br />If you have any questions, please call me. <br />Sincerely, <br /> <br />~~ ~ ~~ V <br />oseph J. Dudash <br />Environmental Protection Specialist <br />cc: Jim Stover (J. E. Stover & Associates) <br />c:\wp61 \bow i e2\hau Icert <br />
The URL can be used to link to this page
Your browser does not support the video tag.