Laserfiche WebLink
c ~ would probably be a wide range of ~cammendations due to <br />___ the variability of soils, we would commit to an applica- <br />_ ___ tion of „00 pounds of (18/46/0) commercial fertilizer <br />per acre to be worked in seed bed prior to seeding. ~ <br />- Seed and seedings will be done according to the <br />re-vegetation plan, on 2.05--;8.42 of the MLRD permit ap- <br />plication. <br />- 16. Back filling of sediment pond will be the last item of <br />earth work that will be done prior to re-vegetation. If <br />there is a problem with the scheduling of this item, as <br />stated in your letter it may be necessary to construct a <br />new pond an the north side of the county road. <br />_ __--- __ %~ r""~ sA~ <br />s~„u,,-~Z ~1.•• <br />_ ~~ <br />- 6 - <br />