Laserfiche WebLink
Table 1 Notes <br />(1) -Includes Mine 3 loadout and access; <br />(2) -Includes Mine 4 fan and loadout; <br />(3) - Sutey reclaimed in 1995, rill and gully maintenance performed in 1999; <br />(4) -Includes Mine 1 fan, road, office complex and loadout; <br />(5) -Roads B, D reclaimed in 2000, Roads E and F reclaimed in 1996; each re-disturbed <br />to accommodate 2004 Outslope Project. Seed applied to re-disturbed portions fall, <br />2004; <br />(6) -One acre of Road E at North Fork of Dutch Creek crossing reclaimed in 1999 as <br />part of the Rock Tunnel Maintenance Project, <br />(7) - Road F acreage includes Mine 3 Fan access road; <br />(8) - Road G reclaimed in 1996, creek crossing maintenance performed in 2002; <br />(9) -Office Vicinity is 10 acres, total. Eight acres reclaimed during the Dutch Creek <br />Diversion project (Channel at 3 acres, adjacent area at 5 acres), 2 acres reclaimed at <br />Facilities Area project; <br />(10) -Upper portion of outslope completed with Mine 3 in 1995, lower portion <br />completed with North Basin Steep Slope Revegetation in 1999. <br />(11) -The Mine Bench Outslopes located at Mine 1, Mine 3 south and at the Mine 5 fan <br />were seeded during the 1999 and 2004 construction seasons. 2004 is used here to <br />describe the yeaz reclamation was completed. Acreages reclaimed aze tabulated <br />only once, in the 2004 reclamation season. <br />25 <br />