My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39466
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39466
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:54 PM
Creation date
11/23/2007 10:11:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Date
2/17/2000
Doc Name
AMENDMENT NO 1 TO PKA 0-455
From
DMG
To
ALL CONATRACTORS BIDDING ON THE FRUITA MINE AMERICAN SHIELD BOND FORFEITURE
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- <br />DIVISION OF MINERALS AND GEOLOGY <br />Oepanmenl of Nalu ral Resources <br />1313 Sherman Sl.. Room 215 <br />Uenver. Colorado 00203 <br />Phune: 13031 066-3 5 6 7 <br />FAX: IJUI) 9J2-01 U6 <br />t.y <br />D I v 15 1 0 N O F <br />MINERALS <br />GEOLOGY <br />0.EC LA MATION <br />MINING•SA FETY <br /> 0J1 Uwens <br /> Governor <br /> Greg E. Walr: her <br />DATE: February 17, 2000 Execul rve O'~reclor <br /> Michael B. long <br />TO: ALL CONTRACTORS BIDDING ON THE FRUITA MME/AMERICAN SHIELD BOND o~.~.~on oircar,. <br /> FORFEITURE <br />FROM: PAUL ICRABACHER, PROTECT MANAGER <br /> PHONE 970-248-7253 <br />RE: AMENDMENT No. I TO PKA-U-455 <br />1 would like to thank-you all for attending the pre-bid meeting held today for [he Fruita Mine bond forfeiture site. <br />Below are the changes or additions to the bid. <br />The Bid Document should be FRUITA MINE/AMERICAN SHIELD BOND FORFEITURE/C-81-01 S <br />not M-81-015 <br />I. Enclosed is a site map of the proposed work for bid. Also enclosed is a post reclamation map showing existing <br />contours WITHOUT the developed galley and associated deposition resulting from the 1999 flood. <br />2. The project Time of Completion has been extended to 35 calendar days after the receipt of [he Notice to Proceed <br />with project work scheduled [o commence April 3, 2000. <br />3. All terms and conditions of the Invitation and Bid other than as changed by Amendment No. 1 and this <br />amendment remain the same. <br />4. Receipt and acceptance of this amendment will he acknowledged by returning the Receipt and acceptance oC <br />Amendment 1 to PKA-0-455 sheet attached. <br />M:Ump\KKHW MENDME.N1~S\FRUITA.PK.doc <br />III IIIIIIIIIIIIIIII <br />STATE OF COLORADO <br />T-d ESZL-BbZ/OL6 ~ay~ege~Nd d60 ~SO 00 bZ -+dki <br />
The URL can be used to link to this page
Your browser does not support the video tag.