Laserfiche WebLink
Lafarge <br />Loveland Pit <br />SUBSTITUTE WATER SUPPLY PLAN <br />MONTHLYACCOUNTING FORM <br />Month: <br />Year: <br /> DESCRIPTION TOTALS FOR MONTH YTD <br />1 Sand and Gravel Production (tons) <br />2 Moisture Loss in Material (ac-ft) <br />3 Evaporation (ac-ft) <br />2 = (tons of material mined ' 0.04 ' 2000 / 62.4) / 43560 <br />3 =monthly net evaporation 'exposed water surface area <br />Exposed water surface area = acres <br />Month Monthly Net Evaporation (ft) <br />Jan 0.07 <br />Feb 0.08 <br />Mar 0.09 <br />Apr 0.19 <br />May 0.25 <br />Jun 0.35 <br />Jul 0.39 <br />Aug 0.35 <br />Sep 0.21 <br />Oct 0.18 <br />Nov 0.08 <br />Dec 0.08 <br />Gross Annual Evaporation = 38 inches <br />Annual Precipitation = 14.75 inches (from Loveland NCWCD Station) <br />