Laserfiche WebLink
If the coal in [he proposed lease area is mined at another date, it • <br />would be done at a higher cost due to the need For reentry. While the <br />economic benefits of Alternative One might still be enjoyed, they would be <br />achieved at a higher cost and hence, less efficienCly. Or the bypassed <br />coal may never be mined due to technical difficulties and economic <br />constraints. <br />There are no Mitigation Measures or Residual Impacts resulting from <br />Alternative Two. <br />Cumulative Impacts <br />Cumulative impacts from Alternative One are expected to be <br />insignificant due co the existing mining activity in the North Fork Valley, <br />the small lease acreage and small amount of expected surface disturbance <br />resulting from potential vent sites, access roads, and drill holes. <br />V, MITIGATION MEASURES <br />The following restrictions are the result of the application of the <br />Unsuitability Criteria: <br />After the application of Criterion Number 16, the 100-year floodplain <br />of the North Fork of the Gunnison River (approximately 16 acres) is <br />• unsuitable for coal mining. However, mining related disturbances may <br />occur i£ a written finding is made by the Authorized Officer that <br />mining will not cause a substantial threat of loss of life ar property <br />and the interests of the public and the landowners affected by mining <br />within the 100-year fioodplain of the North Fork of the Gunnison River <br />will be protected. <br />The Forest Se~•ice issued s?acial use permit to Mountain Coal Company <br />(O1j30j92) fo: spring develo?ments and water transmission liDes <br />located in portions of secc'_ons 21 and 22, T.13S., R.90W., 6th PM. <br />Under Criterion 2, federal lands within such surface leases are <br />unsuitable for coal mining, A coal lease may be issued if the <br />underground mining will not interfere with the special use permit and <br />the parties involved in the special use permit (Mountain Coal <br />Company), agrees, in writing, co coal leasing. <br />No mining re laced disturbances will occur within 100 feet of the <br />outside line of the right-of-way of Colorado State Highway 133 within <br />the tract. The angle of d:a•.r used to protect the State Highway from <br />subsidence will be dic:a:ed by the approved CDMG Mining and <br />Reclamation Plan, (the esti~aced angle of draw is conservatively <br />estimated co be 25 degrees). However, mining related disturbances may <br />occur if, after public novice and the opportunity for public hearing <br />in Che locality, a written finding is made by the Authorized Officer <br />that the interests of the public and the landowners affected by mining <br />within 100 feet of a public road will be protected, <br />For water depletions, as part of the Mining and Reclamation Permit <br />Application Package, the Lessee shall furnish [o the Regulatory <br />Officer at the Office of Surface Hining an estimate of the average <br />?} <br />