Laserfiche WebLink
-21- <br />Deep Creek Canyon Water Monitoring <br />Table 2 - Ground Water Sites <br /> Depth to Water Water Quality Comments <br />Well No. Measured Sampled <br />D3-W Monthly Quarterly Existing Pictured Cliffs completion <br />(W-17) continue required monitoring for <br /> possible mine expansion to the NE of <br /> Revision No. 2 <br />D4-W Monthly Quarterly Existing Alluvial/Fruitland completion <br />(W-18) This well is in path of postulated <br /> flow direction. Near shop <br /> facilities, only well west of Deep <br /> Creek <br />W-19 Monthly Quarterly This is to be an alluvial/colluvial <br /> completion NW of the stockpile. <br /> Should not be more thaen 50' deep. <br /> PUC casing. open from -15' to TD. <br />W-20 Monthly Quarterly This will be completed from top of <br /> the "A" thru bottom of the "B" <br /> seam. Needs bentonite seal at top of <br /> "A" seam. PVC casing <br />Spoils 1 Monthly Quarterly This hole will monitor any aq <br /> uifer development. Will sit on <br /> colluvium. Cap bottom and perforate <br /> entire length. Backfill around stand <br /> pipe. Steel casing. <br />Spoils 2 Monthly -- This hole will monitor effeciency of <br /> drain system. Bottom 10' are <br /> perforated. Cap bottom and sit on <br /> colluvium, backfill around stand <br /> pipe. Steel casing <br />