My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39389
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:51 PM
Creation date
11/23/2007 10:08:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
General Documents
Doc Date
6/19/1985
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR2
From
Deed Creek Area
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-16- <br />The access road to the proposed facilities area from the proposed <br />crushing facility must cross Deep Creek. The normal Deep Creek flows <br />will be conveyed under this road by means of a culvert. During periods <br />of high flow Chimney Rock Coal Company has designed an overflow weir in <br />the road to convey flows in combination with the culvert. There is <br />concern that the permissible ditch velocities used will cause some <br />erosion based upon the site soil characteristics. While this erosion has <br />not been observed elsewhere within the permit boundary the Division feels <br />that Chimney Rock Coal Company must develop an erosion control plan to be <br />implemented should excessive erosion become apparent in the ditches. <br />Therefore, the operator has committed to a plan for ditch erosion control <br />to be implemented in the event excessive erosion is observed in any <br />ditch, within 60 days of permit issuance. <br />Chimney Rock Coal Company has not provided any details on the post-mining <br />drainage both within the mine area and in the area of the permanent <br />excess overburden stockpile. In order to evaluate post-mining drainage <br />control and erosion potential, Chimney Rock will submit an acceptable <br />plan detailing post-mining establishment of drainage channels to the <br />Division. The plan will be submitted within 60 days of permit issuance. <br />The above section is in compliance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.