Laserfiche WebLink
Coors Energy Company <br />March 21, 2007 <br />Page 2 <br />proposed, staked PDC locations could be reviewed by the State, in connection with the proposed well(s) <br />proximity and reclamation operations of the site. After getting some feedback from the State during that <br />location review, I would then put together a proposed master plan related to PDC's proposed drilling <br />plans, including drilling timing, access, battery locations, etc., and famish to Coors. <br />Very truly yours, <br />PETRO DEVELOPMENT CORPORATION <br />~~~~~1T 1 <br />Mac Neumann, Agent <br />AttachmentsMIN <br />