Laserfiche WebLink
• ~~~ ~~~~I~I~~~~~~ ~~~ <br />sss <br /> <br />Eryvirory-neryt, Iryc. <br />LARRY E. O'BRIAN <br />PRESIDENT <br />October 26, 1992 <br />Ms. Lorraine Stepenske <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street Suite 215 <br />Denver, Colorado 80203-2273 <br />Dear Ms. Stepenske: <br />RE: Albert Frei and Sons, Inc. <br />Hazeltine Pit <br />MLRB Permit NO M-77-153 <br />7985 VANCE DRIVE, SUITE 205A <br />ARVADA, COLORADO 80003 <br />303-423-7297 <br /> <br />OCT ~ `~ 199 <br />MINERALS x ~tl'' ` ' <br />On behalf of our client Albert Frei and Sons, Inc. we are <br />asking for a 30 day extension on Items 1 of the inspection report. <br />This is to follow up on our meeting October 15th. Below is a recap <br />of the action taken to date on each item noted on page 3 of the <br />INSPECTION REPORT. As we discussed yesterday regarding regarding <br />the concrete used for fish habitat along the banks, I will write <br />the Department of Health a request for Determination letter <br />regarding this minor fill. I will also submit, as part of the Weed <br />Plan TR, a revision correcting the reclamation plan map to show <br />these areas. If the Department of Health requires a Certificate of <br />Designation (CD) we will apply for one. <br />1) Weed Control P13^: We have contacted the County Extension <br />agent regarding this. He visited the pit in mid-September and <br />confirmed there is a problem. He gave us all the information <br />we needed to prepare a weed control plan and said he did not <br />have the time to prepare one for us. He suggested we review <br />the information he gave us and prepare one our selves. He <br />agreed to review and approve our plan when it is complete. We <br />would like to request an extension to December 15, 1992 for <br />having this plan submitted. We are working on it now and do <br />not know how long it will take to get the EXTENSION SERVICES <br />approval. We are running into some site specific problems in <br />preparing this plan because some of the control methods <br />suggested by the Extension agent will destroy the reclamation <br />work we have completed to date. <br />