Laserfiche WebLink
3, THE GEOTECH WELL, LOCATED AT THE PROJECTED BASE OF THE REFUSE PILE <br />AND COMPLETED IN THE ALLUVIUM, WILL BE SAMPLED MONTHLY FOR WATER LEVEL <br />AND FIELD PARAMETERS AND QUARTERLY FOR FULL SUITE CHEMICAL PARAMETERS. <br />FIELD PARAMETERS <br />TEMPERATURE <br />pH <br />CONDUCTIVITY <br />FLOW OR WATER LEVEL <br />FULL SUITE CHEMICAL PARAMETER <br />pH MAGNESIUM <br />TEMPERATURE SULFATE <br />SPECIFIC CONDUCTANCE FLUORIDE <br />DISSOLVED SOLIDS BORON <br />SODIUM ALKALINITY <br />POTASSIUM BICAR80NATE <br />CALCIUM <br />The requirements of original Stipulation No. 1 have been modified by <br />Technical Revisions 03 (in April, 1988) and 04 (in June, 1988). <br />Stipulation No. 3 <br />SEDIMENT POND SP-1 AND SP-2 WILL BE MAINTAINED WITH SEDIMENT AT OR <br />BELOW THE 60 PERCENT LEVEL. <br />ACCEPTED AND AGREED: MINED LAND RECLAMATION DIVISION <br />C LORADO DEPARTMENT OF <br />U L RESO ES <br />By /'/les~Lt~.JT <br />Aerator Title <br />.s~~- . <br />Division D'rec or <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />8]76G <br />