My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39346
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:49 PM
Creation date
11/23/2007 10:07:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
5/9/1983
Doc Name
BEAR MINE 3 BRIDGE BUTTRESS WORK
From
A C Z INC
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />• <br />r~ ~ ~ INS. <br />ENOINEERINO AND ENVIRONMENTAL DIVISION <br />7J7 LINCOLN AVE. <br />P.O. BOX 771018 <br />STEAM80AT SPRINGS, CO 80177 <br />III IIIIIIIIIIIII III <br />9 <br />t•1ay 4 , 1983 <br />,. ~ _:..:r. _ <br />1~.?;'~ 91933 <br />Mr, Dan Mathews <br />Colorado Mined Land <br />423 Centennial Bldg. <br />1313 Sherman Street <br />Denver, CO 80203 <br />Reclamation Division <br />Re: Bear Mine No. 3 -Bridge Buttress Ylork <br />Dear Dan: <br />r`.: i ~1 iii: ~. n} Rin(Uf a~ ?n97~~rr ne' <br />As you and Craig Springer of the Bear Coal Company have recently <br />discussed, I have inspected and completed tire attached figure of the <br />planried work for the bridge buttress at the bear Mine No. 3. During <br />the near future, the Bear Coal Company plans to place large riprap <br />material on the slopes of the east bridge buttress to protect the <br />bridge during times of high flows of the North Fork of the Gunnison <br />River. The large riprap material will consist of large sandstone <br />boulders which are present on site. Placement of the material will be <br />by backhoe from the existing access road. No additional area will be <br />disturbed during selection of tfre riprap material or by placement of <br />the material. This work is only required as general maintenance to <br />ensure that the bridge will remain in a good stable condition and to <br />prevent erosion of the buttress and subsequent damage to the bridge. <br />The attached figure shows the planned placement of the riprap material <br />on the east buttress. <br />Please review this plan and contact Craig Springer or me with any <br />questions you may have. <br />Sincerely, <br />ACZ INC. <br />~~~,~~ <br />Eldon D. Strid <br />EDS/ig <br />Attachment <br />cc: Craig Springer <br />
The URL can be used to link to this page
Your browser does not support the video tag.