Laserfiche WebLink
Draft Copy <br />STIPULATION p3 - WITHIN 90 DAYS AFTER A PERMIT ISSUANCE, THE PERMITEE MUST <br />PROVIDE THE DIVISION WITH A COMPREHENSIVE TREE AND SHRUB PLANTING PLAN. THE PLAN <br />MUST INCLUDE A LIST OF SPECIES TO BE PLANTED, NUMBERS OF EACH SPECIES PER ACRE AND <br />ACRES TO BE PLANTED. THE PLANTING PLAN MUST ALSO DESCRIBE THE PATTERN TO BE UTI- <br />LIZED IN PLANTING THE PLANT MATERIALS, THE SEASON OF THE YEAR OF PLANTING, AND <br />ALL LOCATIONS WHICH WILL BE PLANTED. <br />MT~IC CTTC. <br />WL.V~J Vpi'/~I 1 <br />P!0~/ 141983 <br />Areas of Reclamatior): MIP!EO LAP!D f'C!F~"..151"! C''!ISIOM <br />Celo. Oepi. of I•!6icf21 Resources <br />With the exception of the refuse area, all interim reclamation is complete <br />at the mine site. The refuse area is approximately 21 acres in size. At the <br />present time there is approximately three acres of reclaimed refuse area; this <br />is the area in which this planting plan will apply to. <br />The refuse area is located in the Mountain Shrubland - Dry Phase area. This <br />plan wi11 describe the trees and shrubs to be planted in this area and, in addition, <br />will describe the trees and shrubs which will be planted in the other four vege- <br />tation areas if it becomes necessary for Snowmass to reclaim these areas. <br />List of Species: <br />For each vegetation community there is a list of trees and shrubs which will <br />be used in each community. Also, the number of trees and shrubs per acre which <br />will be planted is listed. This data was obtained from the vegetation inventory <br />done at the mine site (Appendix 3-V, Volume 11). <br />RIPARIAN WOODLAND <br />Trees Trees/Acre Shrubs Shrubs/Acre <br />Narrowleaf Cottonwood 10 Woods Rose 2,500 <br /> <br /> <br />Rocky Mountain Juniper 14 Thinleaf Alder 500 <br />Blue Spruce 70 Saskatoon Serviceberry 500 <br />