My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39202
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:43 PM
Creation date
11/23/2007 10:02:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
1/21/1994
Doc Name
MEMO RIGHT OF SUCCESSIVE RENEWAL/CONTINUATION OF OPERATIONS
From
DEPT OF LAW
To
DMG
Permit Index Doc Type
PUBLIC CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM natural TO:pM~ <br />Mike Long <br />Page 4 <br />]RN 21. 1'J`.y4 S:SbF'I'1 Al"/4 Y.YJ,7 <br />MLRH meeting, Basin has already petitioned the MLRB for a formal <br />hearing and requested temporary relief under Rule 2.07.4(3.)(d) to <br />allow it to continue mining operations pending a final decision <br />by the MLRH on its renewal application. This Rule provides: <br />(d) When a formal hearing is requested, <br />the Board may grant such relief as it deems <br />appropriate pending final determination of <br />the proceedings if: <br />(i) All parties to the proceedings have <br />been notified and given an opportunity to <br />be heard on a request for temporary reliefs <br />(11) The persop requesting such relief <br />shows that there is substantial likelihood <br />that he will prevail on the merits in the <br />final determination of the proceeding: <br />(iii) Such relief shall not adversely af- <br />fect the public health or safety or cause <br />aignifieant environmental harm to land, air <br />or water resources; and <br />(iv) The relief sought is not the issuance <br />of a permit where a permit has been denied, <br />in whole or in part by the Division. <br />Under this provision of the Rules, the MLRB can grant ouch a <br />request if the above four conditions are met. Because no other <br />person has reset. indicated that it has an interest that may be af- <br />fected by the renewal application, the only current parties to <br />the renewal permit process are Basin and the Division. Basin has <br />notified the Division and so complies with the first condition oP <br />Rule 2.07.4(3)(d). <br />Though the notice provisions oP the Colorado Administrative <br />Procedures Act, Section 24-4-105(a), C.R.S., require that notice <br />to any party be given thirty days prior to any hearing, the only <br />current parties to the renewal applications are Hasin and the Di- <br />vislon. If the Division waives ttie notice requirements of <br />Section 24-4-105(a), the MLRB may proceed to hear Baein'e request <br />for temporary relief at the January 1994 MLRB meeting. Any for- <br />
The URL can be used to link to this page
Your browser does not support the video tag.