My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39181
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:42 PM
Creation date
11/23/2007 10:02:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
General Documents
Doc Date
4/1/1991
Doc Name
STIPULATION 6 PN C-81-047
From
MINREC INC
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_. .,., <br />PEAK FLOW CALCULATIONS FOR DITCHES <br /> AREA A. AREA B AREA C AREA D AREA E <br />DRAINAGE AREA (ACRES) 5.5 3.8 10.9 3.9 4.5 <br />CURVE NO. 74 74 73 73 73 <br />STORM EVENT _YR., 24 HR. 100 100 100 10 10 <br />STORM EVENT in. 2.4 2.4 2.4 1.7 1.7 <br />RUNOFF in. 0.55 0.55 0.51 0.20 0.20 <br />WATERSHED SLOPE 0.31 0.75 0.70 0.68 0.74 <br />SLOPE ADJUSTMENT FACTOR 1.09 1.17 1.17 1.17 1.17 <br />LENGHT OF WATERSHED 400 700 1600 950 950 <br />EQUIVALENT DRAINAGE AREA 3.0 7.5 30 12 12 <br />PEAK FLOW efs/in Fig D-2 6.25 13 35 18 18 <br />ADJUSTED PEAK FLOW 7.02 4.26 7.72 1.30 1.50 <br />The design of Diversion BC is present ed on pag e C-6. Thi s <br />diversion ditch i s designed to handle the 100 year event <br />Prom areas B & C which is shown to be 18.7 CFS on page C- 6. <br />The peak flow cal culated above from a reas B & C is 11.98 <br />CFS. Diversion BC is therefore sized appropria tely. <br />The design of the collection ditch along the north side <br />of the mine bench is presented on page C-11. This ditch <br />is designed to handle the 100 year event from areas B & C <br />which is shown to be 18.7 CFS on page C-11. The peak flow <br />calculated above Prom areas B & C is 11.98 CFS. The <br />collection ditch along the north side of the mine bench is <br />therefore sized appropriately. <br />The design of Ditch A is presented on page C-11. This ditch <br />is designed to handle the 100 year event from areas A, B & C <br />which is shown to be 29.1 CFS on page C-11. The peak flow <br />calculated above from areas A, B & C is 19.00 CFS. Ditch <br />A is therefore sized appropriately. <br />The design of Ditch D is presented on page C-5. This ditch <br />is designed to handle the 10 year event from Area D which <br />is shown to be 3.2 CFS on page C-5. The peak flow calculated <br />above from areas D & B is 2.8 CFS. Ditch D is therefore <br />sized appropriately. <br />C-17 3-29-91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.