Laserfiche WebLink
D G. <br />S <br />III IIIIII'll"~IIII <br />~~~~! ~~~ <br />SNOWMASS COAL COMPANY <br />MAY 111987 <br />MINED LAND <br />~MA710N DIV1810N <br />May S, 1987 <br />Certified Mail <br />Return Receipt Requested <br />Hellen Bond <br />Sievers Ranch 8 Development Co. <br />7149 South Curtice Street <br />Littleton, CO 80120 <br />Dear Ms. Bond: <br />P.O. Box 1354 <br />Palisade, Colorado B 7 526 <br />(303) 464-7951 <br />As you know, Snowmass Coal is in the process of performing final <br />reclamation at its loadout site. In accordance with a commitment <br />made during the permitting process, Snowmass hereby requests written <br />comments from you to determine, as ditch owner, whether you want <br />the ditch retained as is or have the concrete structure removed and <br />the original ditch cross section and grade replaced. <br />Sincerely, <br />. F>So~~""~.~ <br />Jim Stover, P.E. <br />Chief Engineer <br />JES:jp <br />xc: Candace Thompson <br />