Laserfiche WebLink
;.. <br />Mr. Fred Banta <br />February 25, 1985 <br />Page Two <br />Stipulation 7 -This stipulation was resolved September 17, 1985. <br />Stipulation 8 -This stipulation, with The 90-day response time, is acceptable as written. <br />Stipulation 9 -This stipulation is acceptable. <br />Stipulation 10 -Since this stipulation addresses a disturbance which will not Take place <br />during immediate start-up activities, we would request 90 days to address the final <br />disposition of the containment ditch reclamation. <br />Stipulation II -This stipulation is acceptable as written. <br />Stipulation 12 -Peabody request a 90-day response period for this stipulation. Such a <br />time frame would allow us to do The necessary engineering as well as to clear up the <br />water rights issues prior to initiation of construction of the access road and pond ~/006. <br />Stipulation 13 -The bond was submitted to the State on October 3, 1985. <br />Fred, thank you for your consideration of these proposals. If you have any questions, <br />please let me know. <br />Sincerely, <br />Vern R. P annenstiel <br />Colorado Project Manager <br />ss <br />c: J. S. Dingman <br />J. L. Lunan <br />L. G. Shearer <br />R. L. Turk <br />