sufficient time to pursue the possibility of alternative postmining land use for the subject locations and <br />facilities. <br />MR-53 approval decision was issued January 15, 2002. The revision provided additional detail and <br />clarification regarding portal seal installations, and also addressed provision of permanent channel "berm <br />breaks". <br />MR-54 approval decision was issued December 17, 2001. The revision allowed for partial reclamation ofthe <br />former minewater treatment Pond 12, eliminating an embankment to allow the Pond 12 azea to drain into <br />Sedimentation Pond 5. <br />MR-55 approval decision was issued January 25, 2002. The revision allowed For re-activation of Cameo Soil <br />Borrow Area No. 1, for recovery of a small volume of remaining subsoil for placement as cover on refuse area <br />CRDA-2. <br />MR-56 approval decision was issued February 25, 2002. The revision updated certain permit Exhibits to <br />correspond to the approved Pond 5 design configuration. <br />MR-57 approval decision was issued Mazch 1, 2002. The revision allowed for re-activation and re-alignment <br />of temporary Access Road 4, to allow for haulage of cover soil from Cameo Soil Borrow Area No. 2 to refuse <br />azea CRDA-1. <br />MR-58 approval decision was issued Mazch 13, 2002. The revision clarified locations where lowland and <br />upland seedmixes would be applied, and also clarified rock placement details and mulching specifications. <br />MR-59 approval decision was issued July 3, 2002. The revision allowed for replacement of a road dip with a <br />culvert at the North Portal azea. <br />MR-60 approval decision was issued August 8, 2002. The revision incorporated updated airpollution control <br />permits into the approved permit. <br />MR-61 approval decision was issued September 4, 2002. The revision adjusted permanent seedmixes to <br />reduce the seeding rate for grasses and shrubs, and to replace the introduced Russian wildrye with the native <br />Salina wildrye, which had only recently become commercially available. <br />MR-62 appmva] decision was issued September 30, 2002. The revision provided updated identification of <br />interest information. <br />MR-63 approval decision was issued Febmary 24, 2003. The revision allowed for gravel exploration drilling <br />in the Unit Train Loadout area. <br />MR-64 approval decision was issued Mazch 31, 2003. The revision incorporated minor reclamation plan <br />clarifications and scheduling changes associated with the overland conveyor corridor. <br />Succession of Operators <br />SO-2 proposed approval decision was issued March 15, 2002, to allow for transfer of Permit C-1981-041 from <br />